Release history

AutoNexit application changes

Follow user-visible improvements, fixes, and compatibility changes across each published version.

Version

v1.68.2 Reliable background maintenance and leaner storage

Released on

Background maintenance now handles deleted Team Chat conversations safely and prevents stale guest sessions from filling database storage.

What changed

  • Closed memberships for deleted Team Chat conversations without a repeating scheduler error.
  • Added bounded daily pruning for guest sessions older than 24 hours while preserving every authenticated user session.
  • Removed obsolete deployment copies and test caches, rotated oversized logs and compacted fragmented database tables after a verified backup.
Version

v1.68.1 Compact notification delivery controls

Released on

Browser and Telegram controls now share one responsive card, leaving more room for the notifications that need attention.

What changed

  • Combined the Browser and Telegram notification controls into one visual card.
  • Placed both channels side by side on wide screens and in compact rows on smaller screens.
  • Kept every existing status, activation action, keyboard target and delivery behavior unchanged.
Version

v1.68.0 Clear registration channels and Telegram delivery status

Released on

Administrators can see how each account was registered, while users can connect, activate and verify Telegram delivery from Notifications.

What changed

  • Added an exact registration-method column for email, mobile, Google and unknown legacy accounts.
  • Added a Telegram card after browser notifications with the real bot, connection and delivery status plus a direct next action.
  • Reused the existing secure Telegram linking and preference controls without changing authentication flows or adding a database migration.
Version

v1.67.11 WhatsApp beside YouTube in the public footer

Released on

Every public page now offers a direct, accessible WhatsApp chat action beside the official AutoNexit YouTube channel.

What changed

  • Added the approved AutoNexit WhatsApp chat link to the shared footer in all seven languages.
  • Kept both social actions keyboard accessible with localized labels, clear focus and 44-pixel touch targets.
  • Preserved the verified YouTube-only structured identity and did not present WhatsApp as a voice telephone number.
Version

v1.67.10 A clearer official identity for search

Released on

AutoNexit now presents one consistent organization and website identity to search engines, with its official YouTube channel linked from every public footer.

What changed

  • Unified public, Blog and Help Center structured data around one stable AutoNexit organization and website identity.
  • Added the verified AutoNexit YouTube channel to the shared footer with localized accessible labels.
  • Clarified the organization logo, email and Dubai office address without presenting the office as a walk-in location or the WhatsApp number as a voice line.
Version

v1.67.9 One exact visual contract for public navigation

Released on

The public header and footer now retain the same colors, transparency and design tokens on every page, including Product and Pricing.

What changed

  • Removed the last page-specific header backgrounds from Product and Pricing.
  • Isolated shared header and footer colors from page-level theme variables so each public page renders the same chrome.
  • Expanded browser regression checks to compare header color, border, transparency and backdrop treatment as well as dimensions.
Version

v1.67.8 One shared frame for every public page

Released on

Home, Help and the rest of the public website now use the same header and footer dimensions and presentation at every responsive width.

What changed

  • Removed the smaller Home-only header so its height, branding and navigation controls match every other public page.
  • Moved header and footer width, spacing, colors and responsive sizing into one shared presentation contract.
  • Kept page content widths independent while preserving the hamburger breakpoint, LTR/RTL behavior and all existing destinations.
Version

v1.67.7 Responsive breathing room for the public header

Released on

Desktop header spacing now grows smoothly with the viewport while remaining bounded on ultrawide displays.

What changed

  • Made the gaps between the brand, primary navigation and account actions scale with desktop width.
  • Kept the compact 1180px header rail and the 980px mobile breakpoint unchanged.
  • Preserved mobile navigation, RTL/LTR alignment, focus behavior and every destination.
Version

v1.67.6 A tighter header and clearer mobile flow

Released on

Public navigation now stays balanced on wide screens, while the mobile menu and home introduction are easier to scan.

What changed

  • Capped the shared header width and stabilized spacing between the brand, navigation and account actions on large displays.
  • Replaced the mobile Menu label with an accessible animated hamburger control and aligned navigation naturally for LTR and RTL languages.
  • Placed the product preview before the home explanation below 901 pixels and removed the L-shaped drafting frames from the home page and footer.
Version

v1.67.5 Clear legal reading and one email address

Released on

The public legal pages are now easier to navigate, and every Contact email route uses the single official AutoNexit address.

What changed

  • Redesigned Privacy, Terms and Cookie Policy as accessible responsive documents with a contents index and direct links between policies.
  • Preserved the existing legal wording while improving hierarchy, reading width, mobile layout and localized navigation in all seven languages.
  • Standardized every public Contact email action on info@autonexit.com, including the security-topic guidance.