Release history

AutoNexit application changes

Follow user-visible improvements, fixes, and compatibility changes across each published version.

Version

v1.80.0 Ready-to-use Excel sample for controlled document import

Released on

The Revision Vault now provides a governed Excel sample directly inside the document import dialog.

What changed

  • Download the sample from the controlled spreadsheet import dialog without leaving the project.
  • Start from 13 correctly mapped document fields, three realistic sample rows and validated document-type and status lists.
  • The private, permission-checked download is audited and the downloaded workbook round-trips through the same preview and row validation used for imports.
Version

v1.79.4 Practical AutoNexit training without repeated copy

Released on

All eight AutoNexit Training guides now use clear, task-focused introductions and genuinely useful questions instead of repeating the same generated summary.

What changed

  • Removed the duplicate summary beneath every Blog article title while keeping excerpts and SEO descriptions intact.
  • Reworked all eight training guides in seven languages around real product workflows, outcomes, mistakes and responsibility boundaries.
  • Replaced generated FAQ answers with four article-specific questions for every localized training guide.
Version

v1.79.3 Header controls follow the reading direction

Released on

Profile, language, theme and notifications now appear in the expected edge-first order in left-to-right languages, while Persian notification content is explicitly right-to-left and right-aligned.

What changed

  • Placed Profile first from the right edge, followed by Language, Theme and Notifications in non-Persian layouts.
  • Right-aligned the Persian notification heading, messages, empty state and All notifications action.
  • Verified both directions at mobile, tablet, desktop and wide widths without horizontal overflow.
Version

v1.79.2 RTL notification anchoring follows the document direction

Released on

The notification dropdown now stays within Persian desktop and tablet screens even though the header action group preserves its internal left-to-right order.

What changed

  • Anchored the panel from the document-side edge when the page is right-to-left.
  • Verified live-sized mobile, tablet and desktop layouts without changing the header control order.
  • Kept unread filtering, read confirmation and safe navigation behavior unchanged.
Version

v1.79.1 Notification menu stays inside RTL screens

Released on

The header notification panel now opens toward the available space in both right-to-left and left-to-right layouts.

What changed

  • Aligned the notification panel with logical page direction instead of a fixed physical edge.
  • Kept the unread menu fully inside mobile, tablet and desktop viewports in Persian and other supported layouts.
  • Preserved the seven-unread limit, mark-as-read navigation and All notifications link without changing notification data.
Version

v1.79.0 Unread notifications at a glance

Released on

The application header now keeps the newest unread activity close at hand, while revision deletion controls stay contained at every width.

What changed

  • Open the notification bell to see up to seven of the newest unread notifications without leaving the current workspace.
  • Opening an item first records it as read and then follows its safe application destination; All notifications remains available from the menu.
  • Kept revision deletion controls inside their timeline cards on mobile, tablet and narrow split views, with the irreversible confirmation and focus return intact.
Version

v1.78.0 Safe document deletion and automatic installed versions

Released on

Project managers can now remove eligible revision files safely while preserving audit evidence, and installed revisions organize themselves automatically.

What changed

  • Added an explicit, irreversible deletion confirmation for non-Golden revision files and eligible archived documents.
  • Kept compact tombstones in the revision timeline while removing private file access and releasing confirmed storage usage.
  • Made Installed Versions follow the Installed designation automatically, with a clear current version, history and signed downloads.
  • Simplified completed revision cards by hiding status management after all five designations are recorded.
Version

v1.77.0 Automatic document numbers and a clearer revision timeline

Released on

Creating and reviewing controlled documents is now faster, clearer and more consistent across screen sizes.

What changed

  • Document creation now opens centrally, puts the title first and assigns a system-wide number automatically from 1000.
  • Document numbers continue through nine numeric digits and then advance through English-letter ranges.
  • Revision cards keep the file and lifecycle state visible while placing technical evidence and specialist actions in accessible expandable sections.
  • Application Changes pagination keeps useful neighbouring pages visible on mobile without overflowing.
Version

v1.76.4 Compact release history and stable mobile navigation

Released on

Release pages are easier to scan, and the closed application navigation no longer creates sideways scrolling on narrow screens.

What changed

  • Condensed long release archives to the first, current, neighbouring and final pages with clear gaps and previous or next controls.
  • Reduced the mobile pager to the essential destinations without losing its keyboard-sized controls.
  • Removed the closed mobile drawer from layout until the menu is opened.
  • Added responsive regressions for both public release pagination and authenticated navigation width.
Version

v1.76.3 Storage upgrades fit every screen

Released on

The shared capacity-upgrade panel now stays fully contained on narrow mobile screens.

What changed

  • Constrained the shared account and project upgrade form to the available content width.
  • Allowed pricing cards and long localized amounts to shrink safely without horizontal overflow.
  • Added a browser regression that measures the form against its content boundary at every supported viewport.