Five multilingual guides support ransomware response, alarm management, software selection, predictive maintenance and brownfield investment review.
What changed
- Added an industrial ransomware response and evidence plan.
- Added alarm-lifecycle and predictive-maintenance project controls.
- Added software-selection and brownfield ROI decision frameworks.
Five multilingual guides cover supplier access, brownfield digital-twin data, machine vision, robot-cell change and compliance evidence.
What changed
- Added secure vendor-access and brownfield data-pack guidance.
- Added machine-vision acceptance and robot-cell change-control workflows.
- Added a practical OT compliance evidence pack without unsupported certification claims.
Five multilingual guides improve code review, system boundaries, downtime analysis, migration planning and OT risk treatment.
What changed
- Added PLC code-review and S7 modernization workflows.
- Clarified MES, SCADA and ERP data ownership.
- Added downtime root-cause and OT risk-assessment practices.
Five multilingual guides connect industrial AI readiness, asset inventories, troubleshooting, PLC selection and maintainable software design.
What changed
- Added evidence-based industrial AI and OT asset-readiness guidance.
- Added a controlled PLC troubleshooting log and selection workflow.
- Added a maintainable PLC program-architecture guide.
Five multilingual guides cover zones and conduits, maintenance strategy, SCADA design, HMI boundaries and industrial Ethernet selection.
What changed
- Added IEC 62443 starter guidance and maintenance decision criteria.
- Added SCADA design and HMI-versus-SCADA workflows.
- Added a protocol selection matrix for common industrial Ethernet options.
The first expanded batch adds five complete seven-language guides for controllers, SCADA platforms, industrial messaging and practical modernization.
What changed
- Clarified PLC, DCS, PAC, RTU and safety-controller boundaries.
- Added SCADA architecture and platform-selection guidance.
- Added OPC UA versus MQTT and a 90-day smart-manufacturing pilot roadmap.
The Blog can now prepare complete seven-language article families and reveal them atomically at a verified UTC publication time.
What changed
- Added a fail-closed publication schedule that keeps future families out of direct URLs, listings, search, related links, language alternates and sitemaps.
- Published a seven-language pilot comparing digital twins, simulation and SCADA, with primary sources, two original illustrations and explicit product boundaries.
- Recorded the immutable 60-family planning workbook in a 420-record manifest while leaving all unprepared batches visibly blocked behind content, image, source and live-QA gates.
Profile, language, theme and notifications now follow one consistent left-to-right order in the application header.
What changed
- Moved the language selector beside the profile control and placed the theme control immediately after it.
- Kept the requested physical order consistent in both left-to-right and right-to-left interface languages.
- Preserved the notification count, delivery warning, account menu and responsive behavior at every tested width.
Notes are easier to organize, notification health is visible at a glance and project records open directly from their cards.
What changed
- Added accessible note renaming while preserving the existing audited notebook update path.
- Limited the editor drop overlay to real file drags and made notification setup guidance appear only for channels that need attention.
- Moved search into the header action area, added a counted notification bell with delivery-health warning and made project titles and codes direct links.
Compact layouts now keep sign-in visible, streamline Help Center navigation and improve the reading flow across public guides.
What changed
- Kept the sign-in action available in every compact public header and made the Auth logo return directly to Home.
- Reworked Help Center mobile tools as an accessible responsive toolbar and bottom sheet, and removed the Product Atlas sticky offset on narrow screens.
- Centered Pricing FAQ controls and justified article and Help guide copy while preserving keyboard, RTL and responsive behavior.