Project managers can hide a custom task topic and all of its work from selected members through a responsive, accessible access panel.
What changed
- Use the visible three-dot button beside each real topic for rename, ordering and access actions; right-click remains available as a shortcut.
- Keep hidden topics, tasks, files, reminders and related notifications out of the selected member’s workspace, including direct links.
- Exclude every confidential topic from new and previously published Project Passport views, while preventing access changes that conflict with current assignees.
The project member search and invitation form now stays inside the available workspace at tablet and compact desktop widths.
What changed
- Reflowed the member lookup, country, role and access controls before the project navigation can squeeze the form.
- Verified the member, note and task pages at 390, 768, 1024 and 1440 pixels without page-level horizontal overflow.
Project managers can hide a note subtree from selected members, while member lookup, note editing and task navigation are more dependable.
What changed
- Find project members by a complete mobile number whether +98 is entered directly or Iran is selected for a national number.
- Hide a note or folder and all of its descendants from selected project members; confidential notes are also excluded from Project Passport output.
- Remove deleted notes immediately, resize editor tables reliably and use one horizontal topic row that leaves more room for project tasks.
The Revision Vault now provides a governed Excel sample directly inside the document import dialog.
What changed
- Download the sample from the controlled spreadsheet import dialog without leaving the project.
- Start from 13 correctly mapped document fields, three realistic sample rows and validated document-type and status lists.
- The private, permission-checked download is audited and the downloaded workbook round-trips through the same preview and row validation used for imports.
All eight AutoNexit Training guides now use clear, task-focused introductions and genuinely useful questions instead of repeating the same generated summary.
What changed
- Removed the duplicate summary beneath every Blog article title while keeping excerpts and SEO descriptions intact.
- Reworked all eight training guides in seven languages around real product workflows, outcomes, mistakes and responsibility boundaries.
- Replaced generated FAQ answers with four article-specific questions for every localized training guide.
Profile, language, theme and notifications now appear in the expected edge-first order in left-to-right languages, while Persian notification content is explicitly right-to-left and right-aligned.
What changed
- Placed Profile first from the right edge, followed by Language, Theme and Notifications in non-Persian layouts.
- Right-aligned the Persian notification heading, messages, empty state and All notifications action.
- Verified both directions at mobile, tablet, desktop and wide widths without horizontal overflow.
The notification dropdown now stays within Persian desktop and tablet screens even though the header action group preserves its internal left-to-right order.
What changed
- Anchored the panel from the document-side edge when the page is right-to-left.
- Verified live-sized mobile, tablet and desktop layouts without changing the header control order.
- Kept unread filtering, read confirmation and safe navigation behavior unchanged.
The header notification panel now opens toward the available space in both right-to-left and left-to-right layouts.
What changed
- Aligned the notification panel with logical page direction instead of a fixed physical edge.
- Kept the unread menu fully inside mobile, tablet and desktop viewports in Persian and other supported layouts.
- Preserved the seven-unread limit, mark-as-read navigation and All notifications link without changing notification data.
The application header now keeps the newest unread activity close at hand, while revision deletion controls stay contained at every width.
What changed
- Open the notification bell to see up to seven of the newest unread notifications without leaving the current workspace.
- Opening an item first records it as read and then follows its safe application destination; All notifications remains available from the menu.
- Kept revision deletion controls inside their timeline cards on mobile, tablet and narrow split views, with the irreversible confirmation and focus return intact.
Project managers can now remove eligible revision files safely while preserving audit evidence, and installed revisions organize themselves automatically.
What changed
- Added an explicit, irreversible deletion confirmation for non-Golden revision files and eligible archived documents.
- Kept compact tombstones in the revision timeline while removing private file access and releasing confirmed storage usage.
- Made Installed Versions follow the Installed designation automatically, with a clear current version, history and signed downloads.
- Simplified completed revision cards by hiding status management after all five designations are recorded.