Release history

AutoNexit application changes

Follow user-visible improvements, fixes, and compatibility changes across each published version.

Version

v1.7.0 A richer Project Passport for people, engineering, and files

Released on

Published passports now present the delivery team and technical evidence with clearer choices and a more polished public story.

What changed

  • Added project-team roles, grouped engineering registers, per-file metadata controls, richer storage cards, full-width publication integrity details, a marketing footer, and more reliable public file grants.
Version

v1.6.2 A consistent 300 MB storage policy

Released on

New and existing accounts now follow the same storage allowance without stale hosting settings changing the result.

What changed

  • Made the 300 MB decimal allowance code-owned, synchronized all account quota records with a safe usage floor, and updated storage-increase validation and public guidance.
Version

v1.6.1 A clearer, modern Project Passport

Released on

Published project records now open with a concise executive view instead of presenting every technical field at once.

What changed

  • Redesigned the public Project Passport with an at-a-glance index, progressive record disclosure, a responsive execution dashboard, clearer progress and status presentation, and denser technical details that stay folded until requested.
Version

v1.6.0 Automatic language selection with durable preferences

Released on

First-time visitors now receive the most appropriate supported language without losing a language they explicitly selected.

What changed

  • Added server-side country and browser-language resolution, an encrypted one-year locale preference, profile synchronization, accessible public and sign-in language controls, and cache- and crawler-safe localized redirects.
Version

v1.5.0 User leads and privacy-conscious blog analytics

Released on

Administrators can now understand verified acquisition, country and project outcomes, and the blog’s contribution without third-party analytics.

What changed

  • Added first-party server-side attribution, verified-registration reporting, mature-cohort blog conversion analysis, accessible multilingual dashboards, privacy-safe CSV export, and automatic anonymous-data retention.
Version

v1.4.0 Recipient and shared notification references

Released on

Notification references now distinguish personal activity from project events shared with several members.

What changed

  • Added recipient-scoped personal counters, one shared reference for multi-member project events, multilingual name prefixes, and a deterministic legacy-reference upgrade.
Version

v1.3.0 Project references, task topics and professional profiles

Released on

Projects and notifications now use clear sequential references, task boards support topics, and public Project Passports can introduce a consenting project executor.

What changed

  • Added immutable project references, readable notification numbering, project-scoped task topics, optional marketing profiles, executor presentation in Project Passports, and licensed IRANSans typography throughout Persian interfaces.
Version

v1.2.1 Safer multilingual Passport presentation

Released on

Public Project Passports now present workflow values naturally without exposing internal event keys or model names.

What changed

  • Localized controlled status values and replaced lifecycle implementation details with safe translated summaries.
Version

v1.2.0 Project Passport publishing and email preferences

Released on

Project Passports now provide a guided publishing workspace, durable per-version QR access, safer file downloads, and independent email language preferences.

What changed

  • Redesigned Project Passport management and its multilingual public page, issued stable QR access per published version, repaired public downloads, normalized account storage to decimal 500 MB, and separated system-email language from the application language.
Version

v1.1.1 Reliable project member invitations

Released on

Adding a user now resolves verified accounts correctly and keeps project access choices inside a clear invitation flow.

What changed

  • Added a localized country selector, exact email and mobile lookup, explicit account states, queued invitation delivery, and safe project and role selection after lookup.