Release history

AutoNexit application changes

Follow user-visible improvements, fixes, and compatibility changes across each published version.

Version

v1.15.1 Cleaner task-topic actions

Released on

Task topics now keep their sidebar uncluttered while retaining quick organization controls.

What changed

  • Moved rename and ordering actions into a right-click menu, removed the repeated inline icons, and added keyboard-accessible Context Menu and Shift+F10 operation with reliable focus behavior.
Version

v1.15.0 Quota-aware attachments and annual storage renewal

Released on

Attachments now use the account’s available storage as their size boundary, while expired extra capacity has a safe renewal workflow.

What changed

  • Removed fixed attachment-size ceilings, added pre-upload quota checks, preserved stored data after annual capacity expiry, blocked only new project creation when used paid capacity needs renewal, and added a dedicated renewal conversation, administrator action and super-administrator email alert.
Version

v1.14.1 Whole-gigabyte requests and reliable QR previews

Released on

Storage requests now stay language-clean and accept only whole gigabytes, while Persian Project Passport labels remain inside the preview frame.

What changed

  • Removed project-authored text from the account-wide request dialog, enforced whole-GB totals in the browser and API, and corrected RTL SVG anchoring for headings, labels and mixed-direction values.
Version

v1.14.0 Annual storage subscriptions and clearer support

Released on

Storage capacity now has a dedicated annual subscription and renewal workflow with private support identities.

What changed

  • Added GB-based optional-detail capacity requests, dedicated administrator conversations, quota-assignment alerts across browser, email and eligible Telegram accounts, annual subscription and due-date views, editable Persian and English renewal messages, and per-user billing language controls.
Version

v1.13.1 Readable Project Passport QR preview

Released on

The printable QR label preview now keeps its true landscape proportions and uses the available space cleanly.

What changed

  • Removed the stretched empty preview area, made the label responsive to the available panel width, and allowed QR settings to wrap without horizontal overflow on desktop and mobile.
Version

v1.13.0 Reference-matched Project Passport labels

Released on

Project Passport PDF, PNG and SVG labels now use clearer typography and mirror their layout correctly for Persian and LTR languages.

What changed

  • Matched the approved label reference, embedded licensed IRANSans for Persian exports, improved Latin typography, placed details on the left and QR on the right for non-Persian languages, and published all three passports in the canonical sample project with stable access links.
Version

v1.12.0 A complete industrial sample project

Released on

The Persian Sample project now demonstrates real engineering scale, commissioning evidence, controlled files and multiple Project Passports.

What changed

  • Expanded every current and future account sample with 15 fully documented equipment records, 7 software records, 150 I/O points, 7 industrial-network devices, completed I/O checkout and all six checklist reports, evidence-backed punch items, 10 downloadable files under 2 MB, 3 installed versions, 2 backup verifications, 5 completed changes and 3 Project Passport models.
Version

v1.11.0 Faster support triage and clearer engineering passports

Released on

Super administrators are alerted to new requests, pending work is visible in the admin navigation, and engineering groups are easier to browse.

What changed

  • Added queued new-ticket emails for super administrators, red live counts for open tickets and storage requests, and independent collapsible groups for equipment, software, I/O points and network devices in published Project Passports.
Version

v1.10.0 A complete Persian sample project for every account

Released on

The old clone banner and limited English default have been replaced by one practical Persian Sample project.

What changed

  • Added a safe, idempotent sample covering the project notebook, task topics and statuses, engineering registers, I/O, industrial networking, commissioning, punch items, documents, change lifecycle and a Project Passport draft for existing and future accounts.
Version

v1.9.1 Correct Persian text in Project Passport labels

Released on

Persian PDF and PNG labels now keep every Persian letter connected and in the correct reading order.

What changed

  • Improved Persian glyph shaping for project names, headings, field labels and optional publisher lines while preserving the approved landscape layout and stable QR link.