01 Quaderno di progetto 9 Record pubblicati ⌄
A concise view of the retrofit scope, current stage, responsibilities, and next decisions.
Retrofit Packaging Line 2 while preserving controlled production handover and an auditable installed state.
Capture agreed boundaries, functional requirements, exclusions, interfaces, and acceptance criteria here.
Record verified site conditions, constraints, access arrangements, photographs, and follow-up owners.
Keep decisions, actions, owners, due dates, and unresolved questions connected to the project record.
Document the context, alternatives, decision, approver, and effect of each material engineering choice.
Record work completed, people present, tests performed, blockers, and the condition left at the end of the shift.
Preserve test observations, failed checks, corrective work, retests, and objective acceptance evidence.
Track installed revisions, backups, training, open exceptions, accepted deliverables, and final responsibilities.
02 Attività di progetto 4 Record pubblicati ⌄
Argomento: Engineering
Attività
Review the I/O list Completata Priorità Alta Scadenza 7 giu 2026, 16:00
⌄
Verify addresses, signal types, and point descriptions against the electrical drawings.
Dettagli pubblicati Stato Completata Priorità Alta Inizio 1 giu 2026, 07:30 Scadenza 7 giu 2026, 16:00
Attività
Approve the network architecture In corso Priorità Media Scadenza 8 giu 2026, 16:00
⌄
Finalize addressing, VLANs, and PROFINET names with the site team.
Dettagli pubblicati Stato In corso Priorità Media Inizio 1 giu 2026, 07:30 Scadenza 8 giu 2026, 16:00
Argomento: Installation and commissioning
Attività
Test the pressure signal loop In attesa Priorità Urgente Scadenza 9 giu 2026, 16:00
⌄
Verify the pressure transmitter raw and engineering values from field to PLC.
Dettagli pubblicati Stato In attesa Priorità Urgente Inizio 1 giu 2026, 07:30 Scadenza 9 giu 2026, 16:00
Argomento: Handover
Attività
Prepare the handover package Da fare Priorità Alta Scadenza 10 giu 2026, 16:00
⌄
Check as-built documents, software versions, and test reports before handover.
Dettagli pubblicati Stato Da fare Priorità Alta Inizio 1 giu 2026, 07:30 Scadenza 10 giu 2026, 16:00
03 Registri di ingegneria 179 Record pubblicati ⌄
Apparecchiatura
15 ⌄
Apparecchiatura
Apparecchiatura Attivo Tag PLC-101 Nome Main line controller Produttore Siemens Modello S7-1515-2 PN
⌄
Dettagli pubblicati Tag PLC-101 Nome Main line controller Tipo apparecchiatura PLC Produttore Siemens Modello S7-1515-2 PN Codice parte 6ES7515-2AM02-0AB0 Numero di serie SMP-2026-00001 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Production-line control Descrizione Main line controller; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 1 apr 2026, 00:00 Data messa in servizio 1 mag 2026, 00:00 Scadenza garanzia 1 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag HMI-101 Nome Main operator panel Produttore Siemens Modello TP1200 Comfort
⌄
Dettagli pubblicati Tag HMI-101 Nome Main operator panel Tipo apparecchiatura hmi Produttore Siemens Modello TP1200 Comfort Codice parte 6AV2124-0MC01-0AX0 Numero di serie SMP-2026-00002 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Operator interface Descrizione Main operator panel; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 2 apr 2026, 00:00 Data messa in servizio 2 mag 2026, 00:00 Scadenza garanzia 2 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag VFD-201 Nome Infeed conveyor drive Produttore Siemens Modello SINAMICS G120
⌄
Dettagli pubblicati Tag VFD-201 Nome Infeed conveyor drive Tipo apparecchiatura drive Produttore Siemens Modello SINAMICS G120 Codice parte 6SL3210-1KE23-2UF1 Numero di serie SMP-2026-00003 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Product transfer Descrizione Infeed conveyor drive; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 3 apr 2026, 00:00 Data messa in servizio 3 mag 2026, 00:00 Scadenza garanzia 3 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag VFD-202 Nome Outfeed conveyor drive Produttore Siemens Modello SINAMICS G120
⌄
Dettagli pubblicati Tag VFD-202 Nome Outfeed conveyor drive Tipo apparecchiatura drive Produttore Siemens Modello SINAMICS G120 Codice parte 6SL3210-1KE21-7UF1 Numero di serie SMP-2026-00004 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Product transfer Descrizione Outfeed conveyor drive; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 4 apr 2026, 00:00 Data messa in servizio 4 mag 2026, 00:00 Scadenza garanzia 4 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag RIO-101 Nome Remote I/O station Produttore Siemens Modello ET 200SP
⌄
Dettagli pubblicati Tag RIO-101 Nome Remote I/O station Tipo apparecchiatura remote_io Produttore Siemens Modello ET 200SP Codice parte 6ES7155-6AU01-0BN0 Numero di serie SMP-2026-00005 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Process I/O Descrizione Remote I/O station; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 5 apr 2026, 00:00 Data messa in servizio 5 mag 2026, 00:00 Scadenza garanzia 5 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag SW-CTRL-01 Nome Managed control-network switch Produttore Siemens Modello SCALANCE XC208
⌄
Dettagli pubblicati Tag SW-CTRL-01 Nome Managed control-network switch Tipo apparecchiatura network_switch Produttore Siemens Modello SCALANCE XC208 Codice parte 6GK5208-0BA00-2AC2 Numero di serie SMP-2026-00006 Posizione Main control cabinet, packaging hall Quadro MCC-01 Sistema Industrial network Descrizione Managed control-network switch; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 6 apr 2026, 00:00 Data messa in servizio 6 mag 2026, 00:00 Scadenza garanzia 6 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag PT-201 Nome Line pressure transmitter Produttore Endress+Hauser Modello Cerabar PMP51
⌄
Dettagli pubblicati Tag PT-201 Nome Line pressure transmitter Tipo apparecchiatura sensor Produttore Endress+Hauser Modello Cerabar PMP51 Codice parte PMP51-AA21JA1PGJ Numero di serie SMP-2026-00007 Posizione Production line one, packaging hall Quadro FIELD-01 Sistema Process instrumentation Descrizione Line pressure transmitter; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 7 apr 2026, 00:00 Data messa in servizio 7 mag 2026, 00:00 Scadenza garanzia 7 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag LT-101 Nome Tank level transmitter Produttore Endress+Hauser Modello Levelflex FMP51
⌄
Dettagli pubblicati Tag LT-101 Nome Tank level transmitter Tipo apparecchiatura sensor Produttore Endress+Hauser Modello Levelflex FMP51 Codice parte FMP51-AAAACAA Numero di serie SMP-2026-00008 Posizione Production line one, packaging hall Quadro FIELD-01 Sistema Process instrumentation Descrizione Tank level transmitter; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 8 apr 2026, 00:00 Data messa in servizio 8 mag 2026, 00:00 Scadenza garanzia 8 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag XV-101 Nome Feed emergency shutoff valve Produttore Festo Modello DAPS-0080
⌄
Dettagli pubblicati Tag XV-101 Nome Feed emergency shutoff valve Tipo apparecchiatura actuator Produttore Festo Modello DAPS-0080 Codice parte DAPS-0080-090-R-F0507 Numero di serie SMP-2026-00009 Posizione Production line one, packaging hall Quadro FIELD-01 Sistema Control valves Descrizione Feed emergency shutoff valve; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 9 apr 2026, 00:00 Data messa in servizio 9 mag 2026, 00:00 Scadenza garanzia 9 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag MTR-201 Nome Main conveyor motor Produttore ABB Modello M3AA 132S
⌄
Dettagli pubblicati Tag MTR-201 Nome Main conveyor motor Tipo apparecchiatura actuator Produttore ABB Modello M3AA 132S Codice parte 3GAA132001-ASE Numero di serie SMP-2026-00010 Posizione Production line one, packaging hall Quadro FIELD-01 Sistema Product transfer Descrizione Main conveyor motor; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 10 apr 2026, 00:00 Data messa in servizio 10 mag 2026, 00:00 Scadenza garanzia 10 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag PANEL-101 Nome Main control cabinet Produttore Rittal Modello VX25
⌄
Dettagli pubblicati Tag PANEL-101 Nome Main control cabinet Tipo apparecchiatura control_panel Produttore Rittal Modello VX25 Codice parte VX 8806.000 Numero di serie SMP-2026-00011 Posizione Production line one, packaging hall Quadro MCC-01 Sistema Power distribution and control Descrizione Main control cabinet; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 11 apr 2026, 00:00 Data messa in servizio 11 mag 2026, 00:00 Scadenza garanzia 11 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag ENG-101 Nome Project engineering station Produttore Dell Modello Precision 3680
⌄
Dettagli pubblicati Tag ENG-101 Nome Project engineering station Tipo apparecchiatura engineering_station Produttore Dell Modello Precision 3680 Codice parte PRECISION-3680-I7 Numero di serie SMP-2026-00012 Posizione Production line one, packaging hall Quadro MCC-01 Sistema Engineering and maintenance Descrizione Project engineering station; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 12 apr 2026, 00:00 Data messa in servizio 12 mag 2026, 00:00 Scadenza garanzia 12 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag UPS-101 Nome Control uninterruptible power supply Produttore Schneider Electric Modello Smart-UPS SRT
⌄
Dettagli pubblicati Tag UPS-101 Nome Control uninterruptible power supply Tipo apparecchiatura ups Produttore Schneider Electric Modello Smart-UPS SRT Codice parte SRT3000XLI Numero di serie SMP-2026-00013 Posizione Production line one, packaging hall Quadro MCC-01 Sistema Control power Descrizione Control uninterruptible power supply; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 13 apr 2026, 00:00 Data messa in servizio 13 mag 2026, 00:00 Scadenza garanzia 13 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag SAFE-101 Nome Line safety controller Produttore Pilz Modello PNOZmulti 2
⌄
Dettagli pubblicati Tag SAFE-101 Nome Line safety controller Tipo apparecchiatura safety_system Produttore Pilz Modello PNOZmulti 2 Codice parte 772100 Numero di serie SMP-2026-00014 Posizione Production line one, packaging hall Quadro MCC-01 Sistema Machine safety Descrizione Line safety controller; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 14 apr 2026, 00:00 Data messa in servizio 14 mag 2026, 00:00 Scadenza garanzia 14 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Apparecchiatura
Apparecchiatura Attivo Tag VISION-101 Nome Quality-control vision system Produttore Cognex Modello In-Sight 7905
⌄
Dettagli pubblicati Tag VISION-101 Nome Quality-control vision system Tipo apparecchiatura vision_system Produttore Cognex Modello In-Sight 7905 Codice parte IS7905M-363-50 Numero di serie SMP-2026-00015 Posizione Production line one, packaging hall Quadro FIELD-01 Sistema Quality control Descrizione Quality-control vision system; a sample asset recorded with full technical data, installation location, and commissioning history. Stato Attivo Data installazione 15 apr 2026, 00:00 Data messa in servizio 15 mag 2026, 00:00 Scadenza garanzia 15 mag 2028, 00:00 Note Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Software
7 ⌄
Software
Software verified Nome Line control program
⌄
Dettagli pubblicati Nome Line control program Fornitore Siemens Prodotto TIA Portal Versione V19.0 Aggiornamento / service pack Update 3 Versione firmware V3.1.0 Tipo licenza Engineering Floating Installato su PLC-101 Ultima verifica 10 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Operator panel project
⌄
Dettagli pubblicati Nome Operator panel project Fornitore Siemens Prodotto WinCC Unified Versione V19.0 Aggiornamento / service pack Update 3 Versione firmware V19.0.0.3 Tipo licenza Runtime Advanced Installato su HMI-101 Ultima verifica 11 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Drive commissioning parameters
⌄
Dettagli pubblicati Nome Drive commissioning parameters Fornitore Siemens Prodotto Startdrive Versione V19.0 Aggiornamento / service pack HF2 Versione firmware V4.7.13 Tipo licenza Engineering Installato su VFD-201 Ultima verifica 12 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Industrial network configuration
⌄
Dettagli pubblicati Nome Industrial network configuration Fornitore Siemens Prodotto PRONETA Professional Versione V3.7 Aggiornamento / service pack SP1 Versione firmware V3.7.1 Tipo licenza Professional Installato su SW-CTRL-01 Ultima verifica 13 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Machine safety logic
⌄
Dettagli pubblicati Nome Machine safety logic Fornitore Pilz Prodotto PNOZmulti Configurator Versione V11.4 Aggiornamento / service pack Build 184 Versione firmware V2.6.2 Tipo licenza Basic Installato su SAFE-101 Ultima verifica 14 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Machine vision configuration
⌄
Dettagli pubblicati Nome Machine vision configuration Fornitore Cognex Prodotto In-Sight Explorer Versione V6.4.1 Aggiornamento / service pack Patch 2 Versione firmware V6.4.1.2 Tipo licenza Offline Programming Installato su VISION-101 Ultima verifica 15 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Software
Software verified Nome Backup revision management
⌄
Dettagli pubblicati Nome Backup revision management Fornitore AutoNexit Prodotto Revision Vault Exporter Versione V1.11 Aggiornamento / service pack Release 2026.09 Versione firmware V1.11.0 Tipo licenza Project Installato su ENG-101 Ultima verifica 16 giu 2026, 00:00 Note Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Stato verified
Punto I/O
150 ⌄
Punto I/O
Punto I/O Attivo Tag DI-001
⌄
Dettagli pubblicati Tag DI-001 Descrizione Sample line DI point 001 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 0 Indirizzo I0.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-002
⌄
Dettagli pubblicati Tag DO-002 Descrizione Sample line DO point 002 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 1 Indirizzo Q0.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-003
⌄
Dettagli pubblicati Tag AI-003 Descrizione Sample line AI point 003 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 2 Indirizzo IW68 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-004
⌄
Dettagli pubblicati Tag AO-004 Descrizione Sample line AO point 004 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 3 Indirizzo QW70 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-005
⌄
Dettagli pubblicati Tag RTD-005 Descrizione Sample line RTD point 005 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 4 Indirizzo IW72 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-006
⌄
Dettagli pubblicati Tag PULSE-006 Descrizione Sample line PULSE point 006 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 5 Indirizzo Q0.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-007
⌄
Dettagli pubblicati Tag DI-007 Descrizione Sample line DI point 007 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 6 Indirizzo I0.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-008
⌄
Dettagli pubblicati Tag DO-008 Descrizione Sample line DO point 008 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 7 Indirizzo Q0.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-009
⌄
Dettagli pubblicati Tag AI-009 Descrizione Sample line AI point 009 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 8 Indirizzo IW80 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-010
⌄
Dettagli pubblicati Tag AO-010 Descrizione Sample line AO point 010 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 9 Indirizzo QW82 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-011
⌄
Dettagli pubblicati Tag RTD-011 Descrizione Sample line RTD point 011 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 10 Indirizzo IW84 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-012
⌄
Dettagli pubblicati Tag PULSE-012 Descrizione Sample line PULSE point 012 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 11 Indirizzo Q1.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-013
⌄
Dettagli pubblicati Tag DI-013 Descrizione Sample line DI point 013 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 12 Indirizzo I1.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-014
⌄
Dettagli pubblicati Tag DO-014 Descrizione Sample line DO point 014 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 1 Canale 13 Indirizzo Q1.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-015
⌄
Dettagli pubblicati Tag AI-015 Descrizione Sample line AI point 015 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 14 Indirizzo IW92 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-016
⌄
Dettagli pubblicati Tag AO-016 Descrizione Sample line AO point 016 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 1 Canale 15 Indirizzo QW94 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-017
⌄
Dettagli pubblicati Tag RTD-017 Descrizione Sample line RTD point 017 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 0 Indirizzo IW96 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-018
⌄
Dettagli pubblicati Tag PULSE-018 Descrizione Sample line PULSE point 018 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 1 Indirizzo Q2.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-019
⌄
Dettagli pubblicati Tag DI-019 Descrizione Sample line DI point 019 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 2 Indirizzo I2.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-020
⌄
Dettagli pubblicati Tag DO-020 Descrizione Sample line DO point 020 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 3 Indirizzo Q2.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-021
⌄
Dettagli pubblicati Tag AI-021 Descrizione Sample line AI point 021 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 4 Indirizzo IW104 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-022
⌄
Dettagli pubblicati Tag AO-022 Descrizione Sample line AO point 022 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 5 Indirizzo QW106 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-023
⌄
Dettagli pubblicati Tag RTD-023 Descrizione Sample line RTD point 023 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 6 Indirizzo IW108 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-024
⌄
Dettagli pubblicati Tag PULSE-024 Descrizione Sample line PULSE point 024 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 7 Indirizzo Q2.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-025
⌄
Dettagli pubblicati Tag DI-025 Descrizione Sample line DI point 025 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 8 Indirizzo I3.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-026
⌄
Dettagli pubblicati Tag DO-026 Descrizione Sample line DO point 026 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 9 Indirizzo Q3.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-027
⌄
Dettagli pubblicati Tag AI-027 Descrizione Sample line AI point 027 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 10 Indirizzo IW116 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-028
⌄
Dettagli pubblicati Tag AO-028 Descrizione Sample line AO point 028 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 11 Indirizzo QW118 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-029
⌄
Dettagli pubblicati Tag RTD-029 Descrizione Sample line RTD point 029 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 2 Canale 12 Indirizzo IW120 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-030
⌄
Dettagli pubblicati Tag PULSE-030 Descrizione Sample line PULSE point 030 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 13 Indirizzo Q3.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-031
⌄
Dettagli pubblicati Tag DI-031 Descrizione Sample line DI point 031 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 14 Indirizzo I3.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-032
⌄
Dettagli pubblicati Tag DO-032 Descrizione Sample line DO point 032 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 2 Canale 15 Indirizzo Q3.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-033
⌄
Dettagli pubblicati Tag AI-033 Descrizione Sample line AI point 033 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 0 Indirizzo IW128 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-034
⌄
Dettagli pubblicati Tag AO-034 Descrizione Sample line AO point 034 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 1 Indirizzo QW130 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-035
⌄
Dettagli pubblicati Tag RTD-035 Descrizione Sample line RTD point 035 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 2 Indirizzo IW132 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-036
⌄
Dettagli pubblicati Tag PULSE-036 Descrizione Sample line PULSE point 036 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 3 Indirizzo Q4.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-037
⌄
Dettagli pubblicati Tag DI-037 Descrizione Sample line DI point 037 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 4 Indirizzo I4.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-038
⌄
Dettagli pubblicati Tag DO-038 Descrizione Sample line DO point 038 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 5 Indirizzo Q4.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-039
⌄
Dettagli pubblicati Tag AI-039 Descrizione Sample line AI point 039 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 6 Indirizzo IW140 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-040
⌄
Dettagli pubblicati Tag AO-040 Descrizione Sample line AO point 040 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 7 Indirizzo QW142 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-041
⌄
Dettagli pubblicati Tag RTD-041 Descrizione Sample line RTD point 041 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 8 Indirizzo IW144 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-042
⌄
Dettagli pubblicati Tag PULSE-042 Descrizione Sample line PULSE point 042 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 9 Indirizzo Q5.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-043
⌄
Dettagli pubblicati Tag DI-043 Descrizione Sample line DI point 043 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 10 Indirizzo I5.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-044
⌄
Dettagli pubblicati Tag DO-044 Descrizione Sample line DO point 044 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 11 Indirizzo Q5.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-045
⌄
Dettagli pubblicati Tag AI-045 Descrizione Sample line AI point 045 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 12 Indirizzo IW152 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-046
⌄
Dettagli pubblicati Tag AO-046 Descrizione Sample line AO point 046 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 13 Indirizzo QW154 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-047
⌄
Dettagli pubblicati Tag RTD-047 Descrizione Sample line RTD point 047 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 3 Canale 14 Indirizzo IW156 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-048
⌄
Dettagli pubblicati Tag PULSE-048 Descrizione Sample line PULSE point 048 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 3 Canale 15 Indirizzo Q5.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-049
⌄
Dettagli pubblicati Tag DI-049 Descrizione Sample line DI point 049 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 0 Indirizzo I6.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-050
⌄
Dettagli pubblicati Tag DO-050 Descrizione Sample line DO point 050 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 1 Indirizzo Q6.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-051
⌄
Dettagli pubblicati Tag AI-051 Descrizione Sample line AI point 051 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 2 Indirizzo IW164 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-052
⌄
Dettagli pubblicati Tag AO-052 Descrizione Sample line AO point 052 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 3 Indirizzo QW166 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-053
⌄
Dettagli pubblicati Tag RTD-053 Descrizione Sample line RTD point 053 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 4 Indirizzo IW168 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-054
⌄
Dettagli pubblicati Tag PULSE-054 Descrizione Sample line PULSE point 054 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 5 Indirizzo Q6.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-055
⌄
Dettagli pubblicati Tag DI-055 Descrizione Sample line DI point 055 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 6 Indirizzo I6.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-056
⌄
Dettagli pubblicati Tag DO-056 Descrizione Sample line DO point 056 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 7 Indirizzo Q6.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-057
⌄
Dettagli pubblicati Tag AI-057 Descrizione Sample line AI point 057 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 8 Indirizzo IW176 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-058
⌄
Dettagli pubblicati Tag AO-058 Descrizione Sample line AO point 058 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 9 Indirizzo QW178 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-059
⌄
Dettagli pubblicati Tag RTD-059 Descrizione Sample line RTD point 059 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 10 Indirizzo IW180 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-060
⌄
Dettagli pubblicati Tag PULSE-060 Descrizione Sample line PULSE point 060 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 11 Indirizzo Q7.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-061
⌄
Dettagli pubblicati Tag DI-061 Descrizione Sample line DI point 061 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 12 Indirizzo I7.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-062
⌄
Dettagli pubblicati Tag DO-062 Descrizione Sample line DO point 062 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 4 Canale 13 Indirizzo Q7.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-063
⌄
Dettagli pubblicati Tag AI-063 Descrizione Sample line AI point 063 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 14 Indirizzo IW188 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-064
⌄
Dettagli pubblicati Tag AO-064 Descrizione Sample line AO point 064 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 4 Canale 15 Indirizzo QW190 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-065
⌄
Dettagli pubblicati Tag RTD-065 Descrizione Sample line RTD point 065 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 0 Indirizzo IW192 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-066
⌄
Dettagli pubblicati Tag PULSE-066 Descrizione Sample line PULSE point 066 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 1 Indirizzo Q8.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-067
⌄
Dettagli pubblicati Tag DI-067 Descrizione Sample line DI point 067 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 2 Indirizzo I8.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-068
⌄
Dettagli pubblicati Tag DO-068 Descrizione Sample line DO point 068 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 3 Indirizzo Q8.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-069
⌄
Dettagli pubblicati Tag AI-069 Descrizione Sample line AI point 069 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 4 Indirizzo IW200 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-070
⌄
Dettagli pubblicati Tag AO-070 Descrizione Sample line AO point 070 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 5 Indirizzo QW202 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-071
⌄
Dettagli pubblicati Tag RTD-071 Descrizione Sample line RTD point 071 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 6 Indirizzo IW204 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-072
⌄
Dettagli pubblicati Tag PULSE-072 Descrizione Sample line PULSE point 072 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 7 Indirizzo Q8.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-073
⌄
Dettagli pubblicati Tag DI-073 Descrizione Sample line DI point 073 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 8 Indirizzo I9.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-074
⌄
Dettagli pubblicati Tag DO-074 Descrizione Sample line DO point 074 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 9 Indirizzo Q9.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-075
⌄
Dettagli pubblicati Tag AI-075 Descrizione Sample line AI point 075 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 10 Indirizzo IW212 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-076
⌄
Dettagli pubblicati Tag AO-076 Descrizione Sample line AO point 076 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 11 Indirizzo QW214 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-077
⌄
Dettagli pubblicati Tag RTD-077 Descrizione Sample line RTD point 077 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-PLC-01 Slot 5 Canale 12 Indirizzo IW216 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-078
⌄
Dettagli pubblicati Tag PULSE-078 Descrizione Sample line PULSE point 078 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 13 Indirizzo Q9.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-079
⌄
Dettagli pubblicati Tag DI-079 Descrizione Sample line DI point 079 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 14 Indirizzo I9.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-080
⌄
Dettagli pubblicati Tag DO-080 Descrizione Sample line DO point 080 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-PLC-01 Slot 5 Canale 15 Indirizzo Q9.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-081
⌄
Dettagli pubblicati Tag AI-081 Descrizione Sample line AI point 081 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 0 Indirizzo IW224 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-082
⌄
Dettagli pubblicati Tag AO-082 Descrizione Sample line AO point 082 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 1 Indirizzo QW226 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-083
⌄
Dettagli pubblicati Tag RTD-083 Descrizione Sample line RTD point 083 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 2 Indirizzo IW228 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-084
⌄
Dettagli pubblicati Tag PULSE-084 Descrizione Sample line PULSE point 084 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 3 Indirizzo Q10.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-085
⌄
Dettagli pubblicati Tag DI-085 Descrizione Sample line DI point 085 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 4 Indirizzo I10.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-086
⌄
Dettagli pubblicati Tag DO-086 Descrizione Sample line DO point 086 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 5 Indirizzo Q10.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-087
⌄
Dettagli pubblicati Tag AI-087 Descrizione Sample line AI point 087 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 6 Indirizzo IW236 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-088
⌄
Dettagli pubblicati Tag AO-088 Descrizione Sample line AO point 088 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 7 Indirizzo QW238 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-089
⌄
Dettagli pubblicati Tag RTD-089 Descrizione Sample line RTD point 089 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 8 Indirizzo IW240 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-090
⌄
Dettagli pubblicati Tag PULSE-090 Descrizione Sample line PULSE point 090 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 9 Indirizzo Q11.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-091
⌄
Dettagli pubblicati Tag DI-091 Descrizione Sample line DI point 091 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 10 Indirizzo I11.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-092
⌄
Dettagli pubblicati Tag DO-092 Descrizione Sample line DO point 092 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 11 Indirizzo Q11.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-093
⌄
Dettagli pubblicati Tag AI-093 Descrizione Sample line AI point 093 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 12 Indirizzo IW248 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-094
⌄
Dettagli pubblicati Tag AO-094 Descrizione Sample line AO point 094 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 13 Indirizzo QW250 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-095
⌄
Dettagli pubblicati Tag RTD-095 Descrizione Sample line RTD point 095 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 6 Canale 14 Indirizzo IW252 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-096
⌄
Dettagli pubblicati Tag PULSE-096 Descrizione Sample line PULSE point 096 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 6 Canale 15 Indirizzo Q11.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro MCC-01 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-097
⌄
Dettagli pubblicati Tag DI-097 Descrizione Sample line DI point 097 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 0 Indirizzo I12.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-098
⌄
Dettagli pubblicati Tag DO-098 Descrizione Sample line DO point 098 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 1 Indirizzo Q12.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-099
⌄
Dettagli pubblicati Tag AI-099 Descrizione Sample line AI point 099 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 2 Indirizzo IW260 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-100
⌄
Dettagli pubblicati Tag AO-100 Descrizione Sample line AO point 100 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 3 Indirizzo QW262 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-101
⌄
Dettagli pubblicati Tag RTD-101 Descrizione Sample line RTD point 101 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 4 Indirizzo IW264 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-102
⌄
Dettagli pubblicati Tag PULSE-102 Descrizione Sample line PULSE point 102 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 5 Indirizzo Q12.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-103
⌄
Dettagli pubblicati Tag DI-103 Descrizione Sample line DI point 103 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 6 Indirizzo I12.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-104
⌄
Dettagli pubblicati Tag DO-104 Descrizione Sample line DO point 104 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 7 Indirizzo Q12.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-105
⌄
Dettagli pubblicati Tag AI-105 Descrizione Sample line AI point 105 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 8 Indirizzo IW272 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-106
⌄
Dettagli pubblicati Tag AO-106 Descrizione Sample line AO point 106 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 9 Indirizzo QW274 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-107
⌄
Dettagli pubblicati Tag RTD-107 Descrizione Sample line RTD point 107 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 10 Indirizzo IW276 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-108
⌄
Dettagli pubblicati Tag PULSE-108 Descrizione Sample line PULSE point 108 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 11 Indirizzo Q13.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-109
⌄
Dettagli pubblicati Tag DI-109 Descrizione Sample line DI point 109 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 12 Indirizzo I13.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-110
⌄
Dettagli pubblicati Tag DO-110 Descrizione Sample line DO point 110 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 7 Canale 13 Indirizzo Q13.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-111
⌄
Dettagli pubblicati Tag AI-111 Descrizione Sample line AI point 111 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 14 Indirizzo IW284 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-112
⌄
Dettagli pubblicati Tag AO-112 Descrizione Sample line AO point 112 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 7 Canale 15 Indirizzo QW286 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-113
⌄
Dettagli pubblicati Tag RTD-113 Descrizione Sample line RTD point 113 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 0 Indirizzo IW288 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-114
⌄
Dettagli pubblicati Tag PULSE-114 Descrizione Sample line PULSE point 114 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 1 Indirizzo Q14.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-115
⌄
Dettagli pubblicati Tag DI-115 Descrizione Sample line DI point 115 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 2 Indirizzo I14.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-116
⌄
Dettagli pubblicati Tag DO-116 Descrizione Sample line DO point 116 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 3 Indirizzo Q14.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-117
⌄
Dettagli pubblicati Tag AI-117 Descrizione Sample line AI point 117 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 4 Indirizzo IW296 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-118
⌄
Dettagli pubblicati Tag AO-118 Descrizione Sample line AO point 118 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 5 Indirizzo QW298 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-119
⌄
Dettagli pubblicati Tag RTD-119 Descrizione Sample line RTD point 119 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 6 Indirizzo IW300 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-120
⌄
Dettagli pubblicati Tag PULSE-120 Descrizione Sample line PULSE point 120 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 7 Indirizzo Q14.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-121
⌄
Dettagli pubblicati Tag DI-121 Descrizione Sample line DI point 121 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 8 Indirizzo I15.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-122
⌄
Dettagli pubblicati Tag DO-122 Descrizione Sample line DO point 122 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 9 Indirizzo Q15.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-123
⌄
Dettagli pubblicati Tag AI-123 Descrizione Sample line AI point 123 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 10 Indirizzo IW308 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-124
⌄
Dettagli pubblicati Tag AO-124 Descrizione Sample line AO point 124 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 11 Indirizzo QW310 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-125
⌄
Dettagli pubblicati Tag RTD-125 Descrizione Sample line RTD point 125 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 8 Canale 12 Indirizzo IW312 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-126
⌄
Dettagli pubblicati Tag PULSE-126 Descrizione Sample line PULSE point 126 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 13 Indirizzo Q15.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-127
⌄
Dettagli pubblicati Tag DI-127 Descrizione Sample line DI point 127 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 14 Indirizzo I15.6 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-128
⌄
Dettagli pubblicati Tag DO-128 Descrizione Sample line DO point 128 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 8 Canale 15 Indirizzo Q15.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-129
⌄
Dettagli pubblicati Tag AI-129 Descrizione Sample line AI point 129 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 0 Indirizzo IW320 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-130
⌄
Dettagli pubblicati Tag AO-130 Descrizione Sample line AO point 130 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 1 Indirizzo QW322 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-131
⌄
Dettagli pubblicati Tag RTD-131 Descrizione Sample line RTD point 131 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 2 Indirizzo IW324 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-132
⌄
Dettagli pubblicati Tag PULSE-132 Descrizione Sample line PULSE point 132 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 3 Indirizzo Q16.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-133
⌄
Dettagli pubblicati Tag DI-133 Descrizione Sample line DI point 133 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 4 Indirizzo I16.4 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-134
⌄
Dettagli pubblicati Tag DO-134 Descrizione Sample line DO point 134 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 5 Indirizzo Q16.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-135
⌄
Dettagli pubblicati Tag AI-135 Descrizione Sample line AI point 135 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 6 Indirizzo IW332 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-136
⌄
Dettagli pubblicati Tag AO-136 Descrizione Sample line AO point 136 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 7 Indirizzo QW334 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-137
⌄
Dettagli pubblicati Tag RTD-137 Descrizione Sample line RTD point 137 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 8 Indirizzo IW336 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-138
⌄
Dettagli pubblicati Tag PULSE-138 Descrizione Sample line PULSE point 138 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 9 Indirizzo Q17.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-139
⌄
Dettagli pubblicati Tag DI-139 Descrizione Sample line DI point 139 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 10 Indirizzo I17.2 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-140
⌄
Dettagli pubblicati Tag DO-140 Descrizione Sample line DO point 140 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 11 Indirizzo Q17.3 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva No Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-141
⌄
Dettagli pubblicati Tag AI-141 Descrizione Sample line AI point 141 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 12 Indirizzo IW344 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-142
⌄
Dettagli pubblicati Tag AO-142 Descrizione Sample line AO point 142 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 13 Indirizzo QW346 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-143
⌄
Dettagli pubblicati Tag RTD-143 Descrizione Sample line RTD point 143 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 9 Canale 14 Indirizzo IW348 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-144
⌄
Dettagli pubblicati Tag PULSE-144 Descrizione Sample line PULSE point 144 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 9 Canale 15 Indirizzo Q17.7 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DI-145
⌄
Dettagli pubblicati Tag DI-145 Descrizione Sample line DI point 145 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso digitale Tipo dati boolean Rack RACK-RIO-01 Slot 10 Canale 0 Indirizzo I18.0 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag DO-146
⌄
Dettagli pubblicati Tag DO-146 Descrizione Sample line DO point 146 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita digitale Tipo dati boolean Rack RACK-RIO-01 Slot 10 Canale 1 Indirizzo Q18.1 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AI-147
⌄
Dettagli pubblicati Tag AI-147 Descrizione Sample line AI point 147 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale Ingresso analogico Tipo dati real Rack RACK-RIO-01 Slot 10 Canale 2 Indirizzo IW356 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag AO-148
⌄
Dettagli pubblicati Tag AO-148 Descrizione Sample line AO point 148 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale Uscita analogica Tipo dati real Rack RACK-RIO-01 Slot 10 Canale 3 Indirizzo QW358 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità % Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag RTD-149
⌄
Dettagli pubblicati Tag RTD-149 Descrizione Sample line RTD point 149 with function, scaling, and safe state recorded Direzione Ingresso Tipo segnale rtd Tipo dati real Rack RACK-RIO-01 Slot 10 Canale 4 Indirizzo IW360 Minimo ingegneristico 0.000000 Massimo ingegneristico 100.000000 Unità °C Minimo grezzo 0.000000 Massimo grezzo 27648.000000 Stato normale 50 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Punto I/O
Punto I/O Attivo Tag PULSE-150
⌄
Dettagli pubblicati Tag PULSE-150 Descrizione Sample line PULSE point 150 with function, scaling, and safe state recorded Direzione Uscita Tipo segnale pulse Tipo dati boolean Rack RACK-RIO-01 Slot 10 Canale 5 Indirizzo Q18.5 Minimo ingegneristico 0.000000 Massimo ingegneristico 1.000000 Unità state Minimo grezzo 0.000000 Massimo grezzo 1.000000 Stato normale 0 Stato di sicurezza 0 Riserva Sì Posizione Packaging hall, line one Quadro RIO-101 Stato Attivo Note Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Dispositivo di rete
7 ⌄
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo SW-CTRL-01 Modello SCALANCE XC208 Indirizzo IP 192.168.10.2
⌄
Dettagli pubblicati Nome dispositivo SW-CTRL-01 Tipo dispositivo managed_switch Fornitore Siemens Modello SCALANCE XC208 Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo supervisor Nome PROFINET sw-ctrl-01 Indirizzo IP 192.168.10.2 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch Uplink-01 Indirizzo MAC AA:10:00:00:00:01 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo PLC-101 Modello S7-1515-2 PN Indirizzo IP 192.168.10.10
⌄
Dettagli pubblicati Nome dispositivo PLC-101 Tipo dispositivo controller Fornitore Siemens Modello S7-1515-2 PN Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo controller Nome PROFINET plc-101 Indirizzo IP 192.168.10.10 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 1 Indirizzo MAC AA:10:00:00:00:02 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo HMI-101 Modello TP1200 Comfort Indirizzo IP 192.168.10.20
⌄
Dettagli pubblicati Nome dispositivo HMI-101 Tipo dispositivo hmi Fornitore Siemens Modello TP1200 Comfort Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo device Nome PROFINET hmi-101 Indirizzo IP 192.168.10.20 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 2 Indirizzo MAC AA:10:00:00:00:03 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo RIO-101 Modello ET 200SP Indirizzo IP 192.168.10.30
⌄
Dettagli pubblicati Nome dispositivo RIO-101 Tipo dispositivo remote_io Fornitore Siemens Modello ET 200SP Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo device Nome PROFINET rio-101 Indirizzo IP 192.168.10.30 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 3 Indirizzo MAC AA:10:00:00:00:04 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo VFD-201 Modello SINAMICS G120 Indirizzo IP 192.168.10.41
⌄
Dettagli pubblicati Nome dispositivo VFD-201 Tipo dispositivo drive Fornitore Siemens Modello SINAMICS G120 Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo device Nome PROFINET vfd-201 Indirizzo IP 192.168.10.41 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 4 Indirizzo MAC AA:10:00:00:00:05 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo VFD-202 Modello SINAMICS G120 Indirizzo IP 192.168.10.42
⌄
Dettagli pubblicati Nome dispositivo VFD-202 Tipo dispositivo drive Fornitore Siemens Modello SINAMICS G120 Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo device Nome PROFINET vfd-202 Indirizzo IP 192.168.10.42 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 5 Indirizzo MAC AA:10:00:00:00:06 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Dispositivo di rete
Dispositivo di rete Attivo Nome dispositivo VISION-101 Modello In-Sight 7905 Indirizzo IP 192.168.10.50
⌄
Dettagli pubblicati Nome dispositivo VISION-101 Tipo dispositivo vision_system Fornitore Cognex Modello In-Sight 7905 Mezzo di rete industrial_ethernet Protocollo profinet Ruolo del protocollo device Nome PROFINET vision-101 Indirizzo IP 192.168.10.50 Prefisso subnet 24 Maschera subnet 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Porta switch 6 Indirizzo MAC AA:10:00:00:00:07 Posizione Control network, packaging hall Stato Attivo Note Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
04 Esecuzione e messa in servizio 24 Record pubblicati 29% Avanzamento complessivo⌄
Avanzamento complessivo 29%
7 Completati
1 In corso
1 Da verificare
15 Non avviati
Controllo I/O
Controllo I/O Completato Completati 150 Totale 150
100% ⌄
Dettagli pubblicati Filtri ambito Controller ulid: 01m3pcsrf84tw3bh5g3tv9swhz Stato Completato Totale 150 Completati 150 Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
Checklist
Checklist Completato Inizio 29 set 2026, 10:54
100% ⌄
Dettagli pubblicati Versione modello 1 Stato Completato Completamento 100.00 Inizio 29 set 2026, 10:54 Fine 30 set 2026, 10:42
0% ⌄
Dettagli pubblicati Numero P-0001 Descrizione Check and complete both cable-end labels against the as-built drawing. Categoria installation Gravità Media Priorità Alta Stato open Scadenza 10 lug 2026, 00:00 Risoluzione Corrective action is defined; final test and evidence are required after execution.
0% ⌄
Dettagli pubblicati Numero P-0002 Descrizione Align the local flow arrow with the P&ID and installed direction. Categoria mechanical Gravità Bassa Priorità Media Stato In corso Scadenza 11 lug 2026, 00:00 Risoluzione Corrective action is defined; final test and evidence are required after execution.
Anomalia
Anomalia ready_for_review
0% ⌄
Dettagli pubblicati Numero P-0003 Descrizione Record ramp and current-limit parameters in the final revision after the product test. Categoria commissioning Gravità Media Priorità Alta Stato ready_for_review Scadenza 12 lug 2026, 00:00 Risoluzione Corrective action is defined; final test and evidence are required after execution.
0% ⌄
Dettagli pubblicati Numero P-0004 Descrizione The installed gland lacks the required washdown protection; replace and photograph it. Categoria electrical Gravità Alta Priorità Urgente Stato Bloccato Scadenza 13 lug 2026, 00:00 Risoluzione Corrective action is defined; final test and evidence are required after execution.
0% ⌄
Dettagli pubblicati Numero P-0005 Descrizione Remove the disabled alarm from the operator view and record the test result. Categoria software Gravità Bassa Priorità Bassa Stato closed Scadenza 14 lug 2026, 00:00 Risoluzione Correction completed, retest passed, image checked, and item closed. Chiuso il 30 set 2026, 10:42
▤
Voce collegata Complete checkout of 150 production-line I/O points · DI-001
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Complete checkout of 150 production-line I/O points · DO-002
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Complete checkout of 150 production-line I/O points · AI-003
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Completed report · Pre-commissioning readiness
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Completed report · Factory acceptance test
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Completed report · Site acceptance test
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata Completed report · Network commissioning
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata P-0001 · Complete the cabinet network-cable label · Managed control-network switch
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata P-0002 · Correct the flow arrow on valve XV-101 · Feed emergency shutoff valve
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata P-0003 · Record the final outfeed-drive parameters · Outfeed conveyor drive
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata P-0004 · Replace the pressure analog-cable gland · Line pressure transmitter
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata P-0005 · Remove the obsolete HMI alarm · Main operator panel
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
06 Controllo revisioni 10 Record pubblicati ⌄
▤
Controllo revisioni
File di progetto
File tecnici, documenti e risorse approvate disponibili in questa pubblicazione.
10
10 file pubblicati
Dimensione pubblicata: 0.01 MB
Progetti PLC
2
HMI e SCADA
1
Altri file
7
Progetti PLC 2
▤
Voce collegata AX-SMP-IO-001 · Approved I/O register
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.01 MB
▤
Voce collegata AX-SMP-PLC-001 · PLC program recovery guide
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
HMI e SCADA 1
▤
Voce collegata AX-SMP-HMI-001 · HMI configuration definition
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
Altri file 7
▤
Voce collegata AX-SMP-NET-001 · Industrial network plan and settings
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.01 MB
▤
Voce collegata AX-SMP-EL-001 · Main control cabinet single-line diagram
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata AX-SMP-FAT-001 · FAT test report
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata AX-SMP-SAT-001 · SAT test report
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata AX-SMP-BOM-001 · Final project bill of materials
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata AX-SMP-COM-001 · Commissioning event report
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
▤
Voce collegata AX-SMP-MTG-001 · Project handover meeting calendar
◷
Data caricamento 29 set 2026, 10:54
□
Dimensione file 0.00 MB
07 Ciclo delle modifiche 46 Record pubblicati ⌄
Richiesta di modifica
Richiesta di modifica Completato Numero richiesta MOC-SAMPLE-001 Livello di rischio Alta
⌄
Dettagli pubblicati Numero richiesta MOC-SAMPLE-001 Ambito Packaging Line 2 main panel safety relay, mapped inputs, controlled drawings, and acceptance evidence. Motivo The installed relay is obsolete and no longer supported by the manufacturer. Livello di rischio Alta Controlli e dettagli del rischio Lockout, point-to-point verification, witnessed stop-time testing, and documented rollback are mandatory. Impatto Safety: Safety is unavailable during the controlled outage.; Production: One planned shift of downtime.; Technical: Safety I/O mapping and the electrical drawing revision change together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Modifica proposta Install the approved relay, verify every safety input and output, and designate the tested drawing as-built. Priorità Alta Stato Completato Decisione di approvazione Approvato Note di approvazione Approved as part of the localized demonstration workflow. Richiesto il 29 set 2026, 10:54 Approvato il 29 set 2026, 10:54 Note di implementazione Demonstration implementation evidence is ready for review. Fine 29 set 2026, 10:54
Richiesta di modifica
Richiesta di modifica Completato Numero richiesta MOC-SAMPLE-002 Livello di rischio Media
⌄
Dettagli pubblicati Numero richiesta MOC-SAMPLE-002 Ambito Control software, related documents, execution tests, backup, and operator training. Motivo Reduce the broadcast domain and separate engineering traffic. Livello di rischio Media Controlli e dettagli del rischio Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impatto Safety: Preventive safety controls are assessed and recorded.; Production: A planned 30-minute network interruption.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Modifica proposta Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priorità Media Stato Completato Decisione di approvazione Approvato Note di approvazione Scope, risks, test plan, and rollback path were reviewed and approved. Richiesto il 29 set 2026, 10:54 Approvato il 29 set 2026, 10:54 Note di implementazione The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Fine 29 set 2026, 10:54
Richiesta di modifica
Richiesta di modifica Completato Numero richiesta MOC-SAMPLE-003 Livello di rischio Bassa
⌄
Dettagli pubblicati Numero richiesta MOC-SAMPLE-003 Ambito Control software, related documents, execution tests, backup, and operator training. Motivo Stabilize indication and prevent nuisance alarms. Livello di rischio Bassa Controlli e dettagli del rischio Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impatto Safety: Preventive safety controls are assessed and recorded.; Production: No production stop; controlled online test.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Modifica proposta Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priorità Media Stato Completato Decisione di approvazione Approvato Note di approvazione Scope, risks, test plan, and rollback path were reviewed and approved. Richiesto il 29 set 2026, 10:54 Approvato il 29 set 2026, 10:54 Note di implementazione The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Fine 29 set 2026, 10:54
Richiesta di modifica
Richiesta di modifica Completato Numero richiesta MOC-SAMPLE-004 Livello di rischio Media
⌄
Dettagli pubblicati Numero richiesta MOC-SAMPLE-004 Ambito Control software, related documents, execution tests, backup, and operator training. Motivo Prevent product accumulation during line startup. Livello di rischio Media Controlli e dettagli del rischio Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impatto Safety: Preventive safety controls are assessed and recorded.; Production: Dry test followed by a product test.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Modifica proposta Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priorità Alta Stato Completato Decisione di approvazione Approvato Note di approvazione Scope, risks, test plan, and rollback path were reviewed and approved. Richiesto il 29 set 2026, 10:54 Approvato il 29 set 2026, 10:54 Note di implementazione The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Fine 29 set 2026, 10:54
Richiesta di modifica
Richiesta di modifica Completato Numero richiesta MOC-SAMPLE-005 Livello di rischio Bassa
⌄
Dettagli pubblicati Numero richiesta MOC-SAMPLE-005 Ambito Control software, related documents, execution tests, backup, and operator training. Motivo Give maintenance faster access to asset status. Livello di rischio Bassa Controlli e dettagli del rischio Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impatto Safety: Preventive safety controls are assessed and recorded.; Production: No effect on PLC logic or safety.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Modifica proposta Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priorità Bassa Stato Completato Decisione di approvazione Approvato Note di approvazione Scope, risks, test plan, and rollback path were reviewed and approved. Richiesto il 29 set 2026, 10:54 Approvato il 29 set 2026, 10:54 Note di implementazione The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Fine 29 set 2026, 10:54
Evento del ciclo
È stata creata la richiesta di modifica MOC-SAMPLE-001. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-001 è passata da draft a submitted. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-001 è passata da submitted a under_review. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-001 è passata da under_review a approved. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-001 è passata da approved a implementing. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-001 è passata da implementing a completed. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
È stata creata la richiesta di modifica MOC-SAMPLE-002. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-002 è passata da draft a submitted. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-002 è passata da submitted a under_review. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-002 è passata da under_review a approved. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-002 è passata da approved a implementing. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-002 è passata da implementing a completed. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
È stata creata la richiesta di modifica MOC-SAMPLE-003. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-003 è passata da draft a submitted. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-003 è passata da submitted a under_review. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-003 è passata da under_review a approved. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-003 è passata da approved a implementing. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-003 è passata da implementing a completed. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
È stata creata la richiesta di modifica MOC-SAMPLE-004. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-004 è passata da draft a submitted. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-004 è passata da submitted a under_review. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-004 è passata da under_review a approved. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-004 è passata da approved a implementing. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-004 è passata da implementing a completed. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
È stata creata la richiesta di modifica MOC-SAMPLE-005. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-005 è passata da draft a submitted. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-005 è passata da submitted a under_review. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-005 è passata da under_review a approved. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-005 è passata da approved a implementing. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
La richiesta MOC-SAMPLE-005 è passata da implementing a completed. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Controlled revision associated with the change è stato collegato alla richiesta MOC-SAMPLE-001. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Post-change test and acceptance report è stato collegato alla richiesta MOC-SAMPLE-001. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Controlled revision associated with the change è stato collegato alla richiesta MOC-SAMPLE-002. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Post-change test and acceptance report è stato collegato alla richiesta MOC-SAMPLE-002. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Controlled revision associated with the change è stato collegato alla richiesta MOC-SAMPLE-003. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Post-change test and acceptance report è stato collegato alla richiesta MOC-SAMPLE-003. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Controlled revision associated with the change è stato collegato alla richiesta MOC-SAMPLE-004. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Post-change test and acceptance report è stato collegato alla richiesta MOC-SAMPLE-004. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Controlled revision associated with the change è stato collegato alla richiesta MOC-SAMPLE-005. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
Post-change test and acceptance report è stato collegato alla richiesta MOC-SAMPLE-005. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54
Evento del ciclo
È stato creato il passaporto macchina SAMPLE-LINE-01. Avvenuto il 29 set 2026, 10:54
⌄
Dettagli pubblicati Avvenuto il 29 set 2026, 10:54