Open a section to review its published records. Technical detail stays folded until you need it.
01 Project Notebook 9 Published records ⌄
A concise view of the retrofit scope, current stage, responsibilities, and next decisions.
Retrofit Packaging Line 2 while preserving controlled production handover and an auditable installed state.
Capture agreed boundaries, functional requirements, exclusions, interfaces, and acceptance criteria here.
Notebook page
Site Visit
Last updated: Sep 29, 2026, 10:54 AM
Record verified site conditions, constraints, access arrangements, photographs, and follow-up owners.
Keep decisions, actions, owners, due dates, and unresolved questions connected to the project record.
Document the context, alternatives, decision, approver, and effect of each material engineering choice.
Record work completed, people present, tests performed, blockers, and the condition left at the end of the shift.
Preserve test observations, failed checks, corrective work, retests, and objective acceptance evidence.
Track installed revisions, backups, training, open exceptions, accepted deliverables, and final responsibilities.
02 Project tasks 4 Published records ⌄
Topic: Engineering
Task
Review the I/O list Done Priority High Due at Jun 7, 2026, 4:00 PM
⌄
Verify addresses, signal types, and point descriptions against the electrical drawings.
Published details Status Done Priority High Starts at Jun 1, 2026, 7:30 AM Due at Jun 7, 2026, 4:00 PM
Task
Approve the network architecture In progress Priority Medium Due at Jun 8, 2026, 4:00 PM
⌄
Finalize addressing, VLANs, and PROFINET names with the site team.
Published details Status In progress Priority Medium Starts at Jun 1, 2026, 7:30 AM Due at Jun 8, 2026, 4:00 PM
Topic: Installation and commissioning
Task
Test the pressure signal loop Waiting Priority Urgent Due at Jun 9, 2026, 4:00 PM
⌄
Verify the pressure transmitter raw and engineering values from field to PLC.
Published details Status Waiting Priority Urgent Starts at Jun 1, 2026, 7:30 AM Due at Jun 9, 2026, 4:00 PM
Topic: Handover
Task
Prepare the handover package To do Priority High Due at Jun 10, 2026, 4:00 PM
⌄
Check as-built documents, software versions, and test reports before handover.
Published details Status To do Priority High Starts at Jun 1, 2026, 7:30 AM Due at Jun 10, 2026, 4:00 PM
03 Engineering registers 179 Published records ⌄
Equipment
15 ⌄
Equipment
Equipment Active Tag PLC-101 Name Main line controller Manufacturer Siemens Model S7-1515-2 PN
⌄
Published details Tag PLC-101 Name Main line controller Equipment type PLC Manufacturer Siemens Model S7-1515-2 PN Part number 6ES7515-2AM02-0AB0 Serial number SMP-2026-00001 Location Main control cabinet, packaging hall Panel MCC-01 System Production-line control Description Main line controller; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 1, 2026, 12:00 AM Commissioning date May 1, 2026, 12:00 AM Warranty expiry May 1, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag HMI-101 Name Main operator panel Manufacturer Siemens Model TP1200 Comfort
⌄
Published details Tag HMI-101 Name Main operator panel Equipment type hmi Manufacturer Siemens Model TP1200 Comfort Part number 6AV2124-0MC01-0AX0 Serial number SMP-2026-00002 Location Main control cabinet, packaging hall Panel MCC-01 System Operator interface Description Main operator panel; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 2, 2026, 12:00 AM Commissioning date May 2, 2026, 12:00 AM Warranty expiry May 2, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag VFD-201 Name Infeed conveyor drive Manufacturer Siemens Model SINAMICS G120
⌄
Published details Tag VFD-201 Name Infeed conveyor drive Equipment type drive Manufacturer Siemens Model SINAMICS G120 Part number 6SL3210-1KE23-2UF1 Serial number SMP-2026-00003 Location Main control cabinet, packaging hall Panel MCC-01 System Product transfer Description Infeed conveyor drive; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 3, 2026, 12:00 AM Commissioning date May 3, 2026, 12:00 AM Warranty expiry May 3, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag VFD-202 Name Outfeed conveyor drive Manufacturer Siemens Model SINAMICS G120
⌄
Published details Tag VFD-202 Name Outfeed conveyor drive Equipment type drive Manufacturer Siemens Model SINAMICS G120 Part number 6SL3210-1KE21-7UF1 Serial number SMP-2026-00004 Location Main control cabinet, packaging hall Panel MCC-01 System Product transfer Description Outfeed conveyor drive; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 4, 2026, 12:00 AM Commissioning date May 4, 2026, 12:00 AM Warranty expiry May 4, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag RIO-101 Name Remote I/O station Manufacturer Siemens Model ET 200SP
⌄
Published details Tag RIO-101 Name Remote I/O station Equipment type remote_io Manufacturer Siemens Model ET 200SP Part number 6ES7155-6AU01-0BN0 Serial number SMP-2026-00005 Location Main control cabinet, packaging hall Panel MCC-01 System Process I/O Description Remote I/O station; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 5, 2026, 12:00 AM Commissioning date May 5, 2026, 12:00 AM Warranty expiry May 5, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag SW-CTRL-01 Name Managed control-network switch Manufacturer Siemens Model SCALANCE XC208
⌄
Published details Tag SW-CTRL-01 Name Managed control-network switch Equipment type network_switch Manufacturer Siemens Model SCALANCE XC208 Part number 6GK5208-0BA00-2AC2 Serial number SMP-2026-00006 Location Main control cabinet, packaging hall Panel MCC-01 System Industrial network Description Managed control-network switch; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 6, 2026, 12:00 AM Commissioning date May 6, 2026, 12:00 AM Warranty expiry May 6, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag PT-201 Name Line pressure transmitter Manufacturer Endress+Hauser Model Cerabar PMP51
⌄
Published details Tag PT-201 Name Line pressure transmitter Equipment type sensor Manufacturer Endress+Hauser Model Cerabar PMP51 Part number PMP51-AA21JA1PGJ Serial number SMP-2026-00007 Location Production line one, packaging hall Panel FIELD-01 System Process instrumentation Description Line pressure transmitter; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 7, 2026, 12:00 AM Commissioning date May 7, 2026, 12:00 AM Warranty expiry May 7, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag LT-101 Name Tank level transmitter Manufacturer Endress+Hauser Model Levelflex FMP51
⌄
Published details Tag LT-101 Name Tank level transmitter Equipment type sensor Manufacturer Endress+Hauser Model Levelflex FMP51 Part number FMP51-AAAACAA Serial number SMP-2026-00008 Location Production line one, packaging hall Panel FIELD-01 System Process instrumentation Description Tank level transmitter; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 8, 2026, 12:00 AM Commissioning date May 8, 2026, 12:00 AM Warranty expiry May 8, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag XV-101 Name Feed emergency shutoff valve Manufacturer Festo Model DAPS-0080
⌄
Published details Tag XV-101 Name Feed emergency shutoff valve Equipment type actuator Manufacturer Festo Model DAPS-0080 Part number DAPS-0080-090-R-F0507 Serial number SMP-2026-00009 Location Production line one, packaging hall Panel FIELD-01 System Control valves Description Feed emergency shutoff valve; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 9, 2026, 12:00 AM Commissioning date May 9, 2026, 12:00 AM Warranty expiry May 9, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag MTR-201 Name Main conveyor motor Manufacturer ABB Model M3AA 132S
⌄
Published details Tag MTR-201 Name Main conveyor motor Equipment type actuator Manufacturer ABB Model M3AA 132S Part number 3GAA132001-ASE Serial number SMP-2026-00010 Location Production line one, packaging hall Panel FIELD-01 System Product transfer Description Main conveyor motor; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 10, 2026, 12:00 AM Commissioning date May 10, 2026, 12:00 AM Warranty expiry May 10, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag PANEL-101 Name Main control cabinet Manufacturer Rittal Model VX25
⌄
Published details Tag PANEL-101 Name Main control cabinet Equipment type control_panel Manufacturer Rittal Model VX25 Part number VX 8806.000 Serial number SMP-2026-00011 Location Production line one, packaging hall Panel MCC-01 System Power distribution and control Description Main control cabinet; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 11, 2026, 12:00 AM Commissioning date May 11, 2026, 12:00 AM Warranty expiry May 11, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag ENG-101 Name Project engineering station Manufacturer Dell Model Precision 3680
⌄
Published details Tag ENG-101 Name Project engineering station Equipment type engineering_station Manufacturer Dell Model Precision 3680 Part number PRECISION-3680-I7 Serial number SMP-2026-00012 Location Production line one, packaging hall Panel MCC-01 System Engineering and maintenance Description Project engineering station; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 12, 2026, 12:00 AM Commissioning date May 12, 2026, 12:00 AM Warranty expiry May 12, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag UPS-101 Name Control uninterruptible power supply Manufacturer Schneider Electric Model Smart-UPS SRT
⌄
Published details Tag UPS-101 Name Control uninterruptible power supply Equipment type ups Manufacturer Schneider Electric Model Smart-UPS SRT Part number SRT3000XLI Serial number SMP-2026-00013 Location Production line one, packaging hall Panel MCC-01 System Control power Description Control uninterruptible power supply; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 13, 2026, 12:00 AM Commissioning date May 13, 2026, 12:00 AM Warranty expiry May 13, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag SAFE-101 Name Line safety controller Manufacturer Pilz Model PNOZmulti 2
⌄
Published details Tag SAFE-101 Name Line safety controller Equipment type safety_system Manufacturer Pilz Model PNOZmulti 2 Part number 772100 Serial number SMP-2026-00014 Location Production line one, packaging hall Panel MCC-01 System Machine safety Description Line safety controller; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 14, 2026, 12:00 AM Commissioning date May 14, 2026, 12:00 AM Warranty expiry May 14, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Equipment
Equipment Active Tag VISION-101 Name Quality-control vision system Manufacturer Cognex Model In-Sight 7905
⌄
Published details Tag VISION-101 Name Quality-control vision system Equipment type vision_system Manufacturer Cognex Model In-Sight 7905 Part number IS7905M-363-50 Serial number SMP-2026-00015 Location Production line one, packaging hall Panel FIELD-01 System Quality control Description Quality-control vision system; a sample asset recorded with full technical data, installation location, and commissioning history. Status Active Installation date Apr 15, 2026, 12:00 AM Commissioning date May 15, 2026, 12:00 AM Warranty expiry May 15, 2028, 12:00 AM Notes Nameplate, wiring, grounding, configuration version, and manufacturer documents were reviewed and filed in the project record.
Software
7 ⌄
Software
Software verified Name Line control program
⌄
Published details Name Line control program Vendor Siemens Product TIA Portal Version V19.0 Update / service pack Update 3 Firmware version V3.1.0 License type Engineering Floating Installed on PLC-101 Last verified date Jun 10, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Operator panel project
⌄
Published details Name Operator panel project Vendor Siemens Product WinCC Unified Version V19.0 Update / service pack Update 3 Firmware version V19.0.0.3 License type Runtime Advanced Installed on HMI-101 Last verified date Jun 11, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Drive commissioning parameters
⌄
Published details Name Drive commissioning parameters Vendor Siemens Product Startdrive Version V19.0 Update / service pack HF2 Firmware version V4.7.13 License type Engineering Installed on VFD-201 Last verified date Jun 12, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Industrial network configuration
⌄
Published details Name Industrial network configuration Vendor Siemens Product PRONETA Professional Version V3.7 Update / service pack SP1 Firmware version V3.7.1 License type Professional Installed on SW-CTRL-01 Last verified date Jun 13, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Machine safety logic
⌄
Published details Name Machine safety logic Vendor Pilz Product PNOZmulti Configurator Version V11.4 Update / service pack Build 184 Firmware version V2.6.2 License type Basic Installed on SAFE-101 Last verified date Jun 14, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Machine vision configuration
⌄
Published details Name Machine vision configuration Vendor Cognex Product In-Sight Explorer Version V6.4.1 Update / service pack Patch 2 Firmware version V6.4.1.2 License type Offline Programming Installed on VISION-101 Last verified date Jun 15, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
Software
Software verified Name Backup revision management
⌄
Published details Name Backup revision management Vendor AutoNexit Product Revision Vault Exporter Version V1.11 Update / service pack Release 2026.09 Firmware version V1.11.0 License type Project Installed on ENG-101 Last verified date Jun 16, 2026, 12:00 AM Notes Installation media, licence, software version, and firmware compatibility were verified and recorded for controlled recovery. Status verified
I/O point
150 ⌄
I/O point
I/O point Active Tag DI-001
⌄
Published details Tag DI-001 Description Sample line DI point 001 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 1 Channel 0 Address I0.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-002
⌄
Published details Tag DO-002 Description Sample line DO point 002 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 1 Channel 1 Address Q0.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-003
⌄
Published details Tag AI-003 Description Sample line AI point 003 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 1 Channel 2 Address IW68 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-004
⌄
Published details Tag AO-004 Description Sample line AO point 004 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 1 Channel 3 Address QW70 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-005
⌄
Published details Tag RTD-005 Description Sample line RTD point 005 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 1 Channel 4 Address IW72 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-006
⌄
Published details Tag PULSE-006 Description Sample line PULSE point 006 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 1 Channel 5 Address Q0.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-007
⌄
Published details Tag DI-007 Description Sample line DI point 007 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 1 Channel 6 Address I0.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-008
⌄
Published details Tag DO-008 Description Sample line DO point 008 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 1 Channel 7 Address Q0.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-009
⌄
Published details Tag AI-009 Description Sample line AI point 009 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 1 Channel 8 Address IW80 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-010
⌄
Published details Tag AO-010 Description Sample line AO point 010 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 1 Channel 9 Address QW82 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-011
⌄
Published details Tag RTD-011 Description Sample line RTD point 011 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 1 Channel 10 Address IW84 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-012
⌄
Published details Tag PULSE-012 Description Sample line PULSE point 012 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 1 Channel 11 Address Q1.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-013
⌄
Published details Tag DI-013 Description Sample line DI point 013 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 1 Channel 12 Address I1.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-014
⌄
Published details Tag DO-014 Description Sample line DO point 014 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 1 Channel 13 Address Q1.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-015
⌄
Published details Tag AI-015 Description Sample line AI point 015 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 1 Channel 14 Address IW92 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-016
⌄
Published details Tag AO-016 Description Sample line AO point 016 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 1 Channel 15 Address QW94 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-017
⌄
Published details Tag RTD-017 Description Sample line RTD point 017 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 2 Channel 0 Address IW96 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-018
⌄
Published details Tag PULSE-018 Description Sample line PULSE point 018 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 2 Channel 1 Address Q2.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-019
⌄
Published details Tag DI-019 Description Sample line DI point 019 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 2 Channel 2 Address I2.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-020
⌄
Published details Tag DO-020 Description Sample line DO point 020 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 2 Channel 3 Address Q2.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-021
⌄
Published details Tag AI-021 Description Sample line AI point 021 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 2 Channel 4 Address IW104 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-022
⌄
Published details Tag AO-022 Description Sample line AO point 022 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 2 Channel 5 Address QW106 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-023
⌄
Published details Tag RTD-023 Description Sample line RTD point 023 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 2 Channel 6 Address IW108 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-024
⌄
Published details Tag PULSE-024 Description Sample line PULSE point 024 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 2 Channel 7 Address Q2.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-025
⌄
Published details Tag DI-025 Description Sample line DI point 025 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 2 Channel 8 Address I3.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-026
⌄
Published details Tag DO-026 Description Sample line DO point 026 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 2 Channel 9 Address Q3.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-027
⌄
Published details Tag AI-027 Description Sample line AI point 027 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 2 Channel 10 Address IW116 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-028
⌄
Published details Tag AO-028 Description Sample line AO point 028 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 2 Channel 11 Address QW118 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-029
⌄
Published details Tag RTD-029 Description Sample line RTD point 029 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 2 Channel 12 Address IW120 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-030
⌄
Published details Tag PULSE-030 Description Sample line PULSE point 030 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 2 Channel 13 Address Q3.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-031
⌄
Published details Tag DI-031 Description Sample line DI point 031 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 2 Channel 14 Address I3.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-032
⌄
Published details Tag DO-032 Description Sample line DO point 032 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 2 Channel 15 Address Q3.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-033
⌄
Published details Tag AI-033 Description Sample line AI point 033 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 3 Channel 0 Address IW128 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-034
⌄
Published details Tag AO-034 Description Sample line AO point 034 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 3 Channel 1 Address QW130 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-035
⌄
Published details Tag RTD-035 Description Sample line RTD point 035 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 3 Channel 2 Address IW132 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-036
⌄
Published details Tag PULSE-036 Description Sample line PULSE point 036 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 3 Channel 3 Address Q4.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-037
⌄
Published details Tag DI-037 Description Sample line DI point 037 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 3 Channel 4 Address I4.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-038
⌄
Published details Tag DO-038 Description Sample line DO point 038 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 3 Channel 5 Address Q4.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-039
⌄
Published details Tag AI-039 Description Sample line AI point 039 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 3 Channel 6 Address IW140 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-040
⌄
Published details Tag AO-040 Description Sample line AO point 040 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 3 Channel 7 Address QW142 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-041
⌄
Published details Tag RTD-041 Description Sample line RTD point 041 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 3 Channel 8 Address IW144 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-042
⌄
Published details Tag PULSE-042 Description Sample line PULSE point 042 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 3 Channel 9 Address Q5.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-043
⌄
Published details Tag DI-043 Description Sample line DI point 043 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 3 Channel 10 Address I5.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-044
⌄
Published details Tag DO-044 Description Sample line DO point 044 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 3 Channel 11 Address Q5.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-045
⌄
Published details Tag AI-045 Description Sample line AI point 045 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 3 Channel 12 Address IW152 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-046
⌄
Published details Tag AO-046 Description Sample line AO point 046 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 3 Channel 13 Address QW154 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-047
⌄
Published details Tag RTD-047 Description Sample line RTD point 047 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 3 Channel 14 Address IW156 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-048
⌄
Published details Tag PULSE-048 Description Sample line PULSE point 048 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 3 Channel 15 Address Q5.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-049
⌄
Published details Tag DI-049 Description Sample line DI point 049 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 4 Channel 0 Address I6.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-050
⌄
Published details Tag DO-050 Description Sample line DO point 050 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 4 Channel 1 Address Q6.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-051
⌄
Published details Tag AI-051 Description Sample line AI point 051 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 4 Channel 2 Address IW164 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-052
⌄
Published details Tag AO-052 Description Sample line AO point 052 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 4 Channel 3 Address QW166 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-053
⌄
Published details Tag RTD-053 Description Sample line RTD point 053 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 4 Channel 4 Address IW168 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-054
⌄
Published details Tag PULSE-054 Description Sample line PULSE point 054 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 4 Channel 5 Address Q6.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-055
⌄
Published details Tag DI-055 Description Sample line DI point 055 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 4 Channel 6 Address I6.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-056
⌄
Published details Tag DO-056 Description Sample line DO point 056 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 4 Channel 7 Address Q6.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-057
⌄
Published details Tag AI-057 Description Sample line AI point 057 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 4 Channel 8 Address IW176 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-058
⌄
Published details Tag AO-058 Description Sample line AO point 058 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 4 Channel 9 Address QW178 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-059
⌄
Published details Tag RTD-059 Description Sample line RTD point 059 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 4 Channel 10 Address IW180 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-060
⌄
Published details Tag PULSE-060 Description Sample line PULSE point 060 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 4 Channel 11 Address Q7.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-061
⌄
Published details Tag DI-061 Description Sample line DI point 061 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 4 Channel 12 Address I7.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-062
⌄
Published details Tag DO-062 Description Sample line DO point 062 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 4 Channel 13 Address Q7.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-063
⌄
Published details Tag AI-063 Description Sample line AI point 063 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 4 Channel 14 Address IW188 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-064
⌄
Published details Tag AO-064 Description Sample line AO point 064 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 4 Channel 15 Address QW190 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-065
⌄
Published details Tag RTD-065 Description Sample line RTD point 065 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 5 Channel 0 Address IW192 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-066
⌄
Published details Tag PULSE-066 Description Sample line PULSE point 066 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 5 Channel 1 Address Q8.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-067
⌄
Published details Tag DI-067 Description Sample line DI point 067 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 5 Channel 2 Address I8.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-068
⌄
Published details Tag DO-068 Description Sample line DO point 068 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 5 Channel 3 Address Q8.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-069
⌄
Published details Tag AI-069 Description Sample line AI point 069 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 5 Channel 4 Address IW200 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-070
⌄
Published details Tag AO-070 Description Sample line AO point 070 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 5 Channel 5 Address QW202 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-071
⌄
Published details Tag RTD-071 Description Sample line RTD point 071 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 5 Channel 6 Address IW204 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-072
⌄
Published details Tag PULSE-072 Description Sample line PULSE point 072 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 5 Channel 7 Address Q8.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-073
⌄
Published details Tag DI-073 Description Sample line DI point 073 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 5 Channel 8 Address I9.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-074
⌄
Published details Tag DO-074 Description Sample line DO point 074 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 5 Channel 9 Address Q9.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-075
⌄
Published details Tag AI-075 Description Sample line AI point 075 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-PLC-01 Slot 5 Channel 10 Address IW212 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-076
⌄
Published details Tag AO-076 Description Sample line AO point 076 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-PLC-01 Slot 5 Channel 11 Address QW214 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-077
⌄
Published details Tag RTD-077 Description Sample line RTD point 077 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-PLC-01 Slot 5 Channel 12 Address IW216 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-078
⌄
Published details Tag PULSE-078 Description Sample line PULSE point 078 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-PLC-01 Slot 5 Channel 13 Address Q9.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-079
⌄
Published details Tag DI-079 Description Sample line DI point 079 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-PLC-01 Slot 5 Channel 14 Address I9.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-080
⌄
Published details Tag DO-080 Description Sample line DO point 080 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-PLC-01 Slot 5 Channel 15 Address Q9.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-081
⌄
Published details Tag AI-081 Description Sample line AI point 081 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 6 Channel 0 Address IW224 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-082
⌄
Published details Tag AO-082 Description Sample line AO point 082 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 6 Channel 1 Address QW226 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-083
⌄
Published details Tag RTD-083 Description Sample line RTD point 083 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 6 Channel 2 Address IW228 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-084
⌄
Published details Tag PULSE-084 Description Sample line PULSE point 084 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 6 Channel 3 Address Q10.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-085
⌄
Published details Tag DI-085 Description Sample line DI point 085 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 6 Channel 4 Address I10.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-086
⌄
Published details Tag DO-086 Description Sample line DO point 086 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 6 Channel 5 Address Q10.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-087
⌄
Published details Tag AI-087 Description Sample line AI point 087 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 6 Channel 6 Address IW236 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-088
⌄
Published details Tag AO-088 Description Sample line AO point 088 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 6 Channel 7 Address QW238 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-089
⌄
Published details Tag RTD-089 Description Sample line RTD point 089 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 6 Channel 8 Address IW240 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-090
⌄
Published details Tag PULSE-090 Description Sample line PULSE point 090 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 6 Channel 9 Address Q11.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-091
⌄
Published details Tag DI-091 Description Sample line DI point 091 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 6 Channel 10 Address I11.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-092
⌄
Published details Tag DO-092 Description Sample line DO point 092 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 6 Channel 11 Address Q11.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-093
⌄
Published details Tag AI-093 Description Sample line AI point 093 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 6 Channel 12 Address IW248 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-094
⌄
Published details Tag AO-094 Description Sample line AO point 094 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 6 Channel 13 Address QW250 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-095
⌄
Published details Tag RTD-095 Description Sample line RTD point 095 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 6 Channel 14 Address IW252 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-096
⌄
Published details Tag PULSE-096 Description Sample line PULSE point 096 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 6 Channel 15 Address Q11.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel MCC-01 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-097
⌄
Published details Tag DI-097 Description Sample line DI point 097 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 7 Channel 0 Address I12.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-098
⌄
Published details Tag DO-098 Description Sample line DO point 098 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 7 Channel 1 Address Q12.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-099
⌄
Published details Tag AI-099 Description Sample line AI point 099 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 7 Channel 2 Address IW260 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-100
⌄
Published details Tag AO-100 Description Sample line AO point 100 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 7 Channel 3 Address QW262 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-101
⌄
Published details Tag RTD-101 Description Sample line RTD point 101 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 7 Channel 4 Address IW264 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-102
⌄
Published details Tag PULSE-102 Description Sample line PULSE point 102 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 7 Channel 5 Address Q12.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-103
⌄
Published details Tag DI-103 Description Sample line DI point 103 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 7 Channel 6 Address I12.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-104
⌄
Published details Tag DO-104 Description Sample line DO point 104 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 7 Channel 7 Address Q12.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-105
⌄
Published details Tag AI-105 Description Sample line AI point 105 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 7 Channel 8 Address IW272 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-106
⌄
Published details Tag AO-106 Description Sample line AO point 106 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 7 Channel 9 Address QW274 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-107
⌄
Published details Tag RTD-107 Description Sample line RTD point 107 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 7 Channel 10 Address IW276 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-108
⌄
Published details Tag PULSE-108 Description Sample line PULSE point 108 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 7 Channel 11 Address Q13.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-109
⌄
Published details Tag DI-109 Description Sample line DI point 109 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 7 Channel 12 Address I13.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-110
⌄
Published details Tag DO-110 Description Sample line DO point 110 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 7 Channel 13 Address Q13.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-111
⌄
Published details Tag AI-111 Description Sample line AI point 111 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 7 Channel 14 Address IW284 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-112
⌄
Published details Tag AO-112 Description Sample line AO point 112 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 7 Channel 15 Address QW286 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-113
⌄
Published details Tag RTD-113 Description Sample line RTD point 113 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 8 Channel 0 Address IW288 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-114
⌄
Published details Tag PULSE-114 Description Sample line PULSE point 114 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 8 Channel 1 Address Q14.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-115
⌄
Published details Tag DI-115 Description Sample line DI point 115 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 8 Channel 2 Address I14.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-116
⌄
Published details Tag DO-116 Description Sample line DO point 116 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 8 Channel 3 Address Q14.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-117
⌄
Published details Tag AI-117 Description Sample line AI point 117 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 8 Channel 4 Address IW296 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-118
⌄
Published details Tag AO-118 Description Sample line AO point 118 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 8 Channel 5 Address QW298 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-119
⌄
Published details Tag RTD-119 Description Sample line RTD point 119 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 8 Channel 6 Address IW300 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-120
⌄
Published details Tag PULSE-120 Description Sample line PULSE point 120 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 8 Channel 7 Address Q14.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-121
⌄
Published details Tag DI-121 Description Sample line DI point 121 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 8 Channel 8 Address I15.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-122
⌄
Published details Tag DO-122 Description Sample line DO point 122 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 8 Channel 9 Address Q15.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-123
⌄
Published details Tag AI-123 Description Sample line AI point 123 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 8 Channel 10 Address IW308 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-124
⌄
Published details Tag AO-124 Description Sample line AO point 124 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 8 Channel 11 Address QW310 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-125
⌄
Published details Tag RTD-125 Description Sample line RTD point 125 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 8 Channel 12 Address IW312 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-126
⌄
Published details Tag PULSE-126 Description Sample line PULSE point 126 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 8 Channel 13 Address Q15.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-127
⌄
Published details Tag DI-127 Description Sample line DI point 127 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 8 Channel 14 Address I15.6 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-128
⌄
Published details Tag DO-128 Description Sample line DO point 128 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 8 Channel 15 Address Q15.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-129
⌄
Published details Tag AI-129 Description Sample line AI point 129 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 9 Channel 0 Address IW320 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-130
⌄
Published details Tag AO-130 Description Sample line AO point 130 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 9 Channel 1 Address QW322 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-131
⌄
Published details Tag RTD-131 Description Sample line RTD point 131 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 9 Channel 2 Address IW324 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-132
⌄
Published details Tag PULSE-132 Description Sample line PULSE point 132 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 9 Channel 3 Address Q16.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-133
⌄
Published details Tag DI-133 Description Sample line DI point 133 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 9 Channel 4 Address I16.4 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-134
⌄
Published details Tag DO-134 Description Sample line DO point 134 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 9 Channel 5 Address Q16.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-135
⌄
Published details Tag AI-135 Description Sample line AI point 135 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 9 Channel 6 Address IW332 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-136
⌄
Published details Tag AO-136 Description Sample line AO point 136 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 9 Channel 7 Address QW334 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-137
⌄
Published details Tag RTD-137 Description Sample line RTD point 137 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 9 Channel 8 Address IW336 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-138
⌄
Published details Tag PULSE-138 Description Sample line PULSE point 138 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 9 Channel 9 Address Q17.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-139
⌄
Published details Tag DI-139 Description Sample line DI point 139 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 9 Channel 10 Address I17.2 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-140
⌄
Published details Tag DO-140 Description Sample line DO point 140 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 9 Channel 11 Address Q17.3 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare No Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-141
⌄
Published details Tag AI-141 Description Sample line AI point 141 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 9 Channel 12 Address IW344 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-142
⌄
Published details Tag AO-142 Description Sample line AO point 142 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 9 Channel 13 Address QW346 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-143
⌄
Published details Tag RTD-143 Description Sample line RTD point 143 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 9 Channel 14 Address IW348 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-144
⌄
Published details Tag PULSE-144 Description Sample line PULSE point 144 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 9 Channel 15 Address Q17.7 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DI-145
⌄
Published details Tag DI-145 Description Sample line DI point 145 with function, scaling, and safe state recorded Direction Input Signal type Digital input Data type boolean Rack RACK-RIO-01 Slot 10 Channel 0 Address I18.0 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag DO-146
⌄
Published details Tag DO-146 Description Sample line DO point 146 with function, scaling, and safe state recorded Direction Output Signal type Digital output Data type boolean Rack RACK-RIO-01 Slot 10 Channel 1 Address Q18.1 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AI-147
⌄
Published details Tag AI-147 Description Sample line AI point 147 with function, scaling, and safe state recorded Direction Input Signal type Analog input Data type real Rack RACK-RIO-01 Slot 10 Channel 2 Address IW356 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag AO-148
⌄
Published details Tag AO-148 Description Sample line AO point 148 with function, scaling, and safe state recorded Direction Output Signal type Analog output Data type real Rack RACK-RIO-01 Slot 10 Channel 3 Address QW358 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit % Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag RTD-149
⌄
Published details Tag RTD-149 Description Sample line RTD point 149 with function, scaling, and safe state recorded Direction Input Signal type rtd Data type real Rack RACK-RIO-01 Slot 10 Channel 4 Address IW360 Engineering minimum 0.000000 Engineering maximum 100.000000 Unit °C Raw minimum 0.000000 Raw maximum 27648.000000 Normal state 50 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
I/O point
I/O point Active Tag PULSE-150
⌄
Published details Tag PULSE-150 Description Sample line PULSE point 150 with function, scaling, and safe state recorded Direction Output Signal type pulse Data type boolean Rack RACK-RIO-01 Slot 10 Channel 5 Address Q18.5 Engineering minimum 0.000000 Engineering maximum 1.000000 Unit state Raw minimum 0.000000 Raw maximum 1.000000 Normal state 0 Failsafe state 0 Spare Yes Location Packaging hall, line one Panel RIO-101 Status Active Notes Terminal, cable, signal direction, engineering scale, and fail-safe logic were verified against the as-built drawing.
Network device
7 ⌄
Network device
Network device Active Device name SW-CTRL-01 Model SCALANCE XC208 IP address 192.168.10.2
⌄
Published details Device name SW-CTRL-01 Device type managed_switch Vendor Siemens Model SCALANCE XC208 Network medium industrial_ethernet Protocol profinet Protocol role supervisor PROFINET name sw-ctrl-01 IP address 192.168.10.2 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port Uplink-01 MAC address AA:10:00:00:00:01 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name PLC-101 Model S7-1515-2 PN IP address 192.168.10.10
⌄
Published details Device name PLC-101 Device type controller Vendor Siemens Model S7-1515-2 PN Network medium industrial_ethernet Protocol profinet Protocol role controller PROFINET name plc-101 IP address 192.168.10.10 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 1 MAC address AA:10:00:00:00:02 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name HMI-101 Model TP1200 Comfort IP address 192.168.10.20
⌄
Published details Device name HMI-101 Device type hmi Vendor Siemens Model TP1200 Comfort Network medium industrial_ethernet Protocol profinet Protocol role device PROFINET name hmi-101 IP address 192.168.10.20 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 2 MAC address AA:10:00:00:00:03 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name RIO-101 Model ET 200SP IP address 192.168.10.30
⌄
Published details Device name RIO-101 Device type remote_io Vendor Siemens Model ET 200SP Network medium industrial_ethernet Protocol profinet Protocol role device PROFINET name rio-101 IP address 192.168.10.30 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 3 MAC address AA:10:00:00:00:04 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name VFD-201 Model SINAMICS G120 IP address 192.168.10.41
⌄
Published details Device name VFD-201 Device type drive Vendor Siemens Model SINAMICS G120 Network medium industrial_ethernet Protocol profinet Protocol role device PROFINET name vfd-201 IP address 192.168.10.41 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 4 MAC address AA:10:00:00:00:05 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name VFD-202 Model SINAMICS G120 IP address 192.168.10.42
⌄
Published details Device name VFD-202 Device type drive Vendor Siemens Model SINAMICS G120 Network medium industrial_ethernet Protocol profinet Protocol role device PROFINET name vfd-202 IP address 192.168.10.42 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 5 MAC address AA:10:00:00:00:06 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
Network device
Network device Active Device name VISION-101 Model In-Sight 7905 IP address 192.168.10.50
⌄
Published details Device name VISION-101 Device type vision_system Vendor Cognex Model In-Sight 7905 Network medium industrial_ethernet Protocol profinet Protocol role device PROFINET name vision-101 IP address 192.168.10.50 Subnet prefix 24 Subnet mask 255.255.255.0 Gateway 192.168.10.1 VLAN 10 Switch port 6 MAC address AA:10:00:00:00:07 Location Control network, packaging hall Status Active Notes Address, PROFINET name, VLAN, switch port, and MAC were verified against the network drawing and configuration backup.
04 Execution and commissioning 24 Published records 29% Overall completion⌄
7 Completed
1 In progress
1 Needs attention
15 Not started
I/O checkout
I/O checkout Completed Completed 150 Total 150
100% ⌄
Published details Scope filters Controller ulid: 01m3pcsrf84tw3bh5g3tv9swhz Status Completed Total 150 Completed 150 Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
Checklist
Checklist Completed Started at Sep 29, 2026, 10:54 AM
100% ⌄
Published details Template version 1 Status Completed Completion 100.00 Started at Sep 29, 2026, 10:54 AM Completed at Sep 30, 2026, 10:42 AM
0% ⌄
Published details Number P-0001 Description Check and complete both cable-end labels against the as-built drawing. Category installation Severity Medium Priority High Status open Due date Jul 10, 2026, 12:00 AM Resolution Corrective action is defined; final test and evidence are required after execution.
Punch item
Punch item In progress
0% ⌄
Published details Number P-0002 Description Align the local flow arrow with the P&ID and installed direction. Category mechanical Severity Low Priority Medium Status In progress Due date Jul 11, 2026, 12:00 AM Resolution Corrective action is defined; final test and evidence are required after execution.
Punch item
Punch item ready_for_review
0% ⌄
Published details Number P-0003 Description Record ramp and current-limit parameters in the final revision after the product test. Category commissioning Severity Medium Priority High Status ready_for_review Due date Jul 12, 2026, 12:00 AM Resolution Corrective action is defined; final test and evidence are required after execution.
Punch item
Punch item Blocked
0% ⌄
Published details Number P-0004 Description The installed gland lacks the required washdown protection; replace and photograph it. Category electrical Severity High Priority Urgent Status Blocked Due date Jul 13, 2026, 12:00 AM Resolution Corrective action is defined; final test and evidence are required after execution.
Punch item
Punch item closed
0% ⌄
Published details Number P-0005 Description Remove the disabled alarm from the operator view and record the test result. Category software Severity Low Priority Low Status closed Due date Jul 14, 2026, 12:00 AM Resolution Correction completed, retest passed, image checked, and item closed. Closed at Sep 30, 2026, 10:42 AM
▤
Related record Complete checkout of 150 production-line I/O points · DI-001
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Complete checkout of 150 production-line I/O points · DO-002
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Complete checkout of 150 production-line I/O points · AI-003
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Completed report · Pre-commissioning readiness
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Completed report · Factory acceptance test
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Completed report · Site acceptance test
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record Completed report · Network commissioning
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record P-0001 · Complete the cabinet network-cable label · Managed control-network switch
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record P-0002 · Correct the flow arrow on valve XV-101 · Feed emergency shutoff valve
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record P-0003 · Record the final outfeed-drive parameters · Outfeed conveyor drive
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record P-0004 · Replace the pressure analog-cable gland · Line pressure transmitter
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record P-0005 · Remove the obsolete HMI alarm · Main operator panel
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
06 Revision control 10 Published records ⌄
▤
Revision control
Project files
Technical files, documents, and approved project resources available in this publication.
10
10 published files
Published size: 0.01 MB
PLC projects
2
HMI and SCADA
1
Other files
7
PLC projects 2
▤
Related record AX-SMP-IO-001 · Approved I/O register
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.01 MB
▤
Related record AX-SMP-PLC-001 · PLC program recovery guide
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
HMI and SCADA 1
▤
Related record AX-SMP-HMI-001 · HMI configuration definition
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
Other files 7
▤
Related record AX-SMP-NET-001 · Industrial network plan and settings
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.01 MB
▤
Related record AX-SMP-EL-001 · Main control cabinet single-line diagram
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record AX-SMP-FAT-001 · FAT test report
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record AX-SMP-SAT-001 · SAT test report
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record AX-SMP-BOM-001 · Final project bill of materials
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record AX-SMP-COM-001 · Commissioning event report
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
▤
Related record AX-SMP-MTG-001 · Project handover meeting calendar
◷
Uploaded at Sep 29, 2026, 10:54 AM
□
File size 0.00 MB
07 Change lifecycle 46 Published records ⌄
Modification request
Modification request Completed Request number MOC-SAMPLE-001 Risk level High
⌄
Published details Request number MOC-SAMPLE-001 Scope Packaging Line 2 main panel safety relay, mapped inputs, controlled drawings, and acceptance evidence. Reason The installed relay is obsolete and no longer supported by the manufacturer. Risk level High Risk controls and details Lockout, point-to-point verification, witnessed stop-time testing, and documented rollback are mandatory. Impact Safety: Safety is unavailable during the controlled outage.; Production: One planned shift of downtime.; Technical: Safety I/O mapping and the electrical drawing revision change together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Proposed change Install the approved relay, verify every safety input and output, and designate the tested drawing as-built. Priority High Status Completed Approval decision Approved Approval notes Approved as part of the localized demonstration workflow. Requested at Sep 29, 2026, 10:54 AM Approved at Sep 29, 2026, 10:54 AM Implementation notes Demonstration implementation evidence is ready for review. Completed at Sep 29, 2026, 10:54 AM
Modification request
Modification request Completed Request number MOC-SAMPLE-002 Risk level Medium
⌄
Published details Request number MOC-SAMPLE-002 Scope Control software, related documents, execution tests, backup, and operator training. Reason Reduce the broadcast domain and separate engineering traffic. Risk level Medium Risk controls and details Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impact Safety: Preventive safety controls are assessed and recorded.; Production: A planned 30-minute network interruption.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Proposed change Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priority Medium Status Completed Approval decision Approved Approval notes Scope, risks, test plan, and rollback path were reviewed and approved. Requested at Sep 29, 2026, 10:54 AM Approved at Sep 29, 2026, 10:54 AM Implementation notes The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Completed at Sep 29, 2026, 10:54 AM
Modification request
Modification request Completed Request number MOC-SAMPLE-003 Risk level Low
⌄
Published details Request number MOC-SAMPLE-003 Scope Control software, related documents, execution tests, backup, and operator training. Reason Stabilize indication and prevent nuisance alarms. Risk level Low Risk controls and details Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impact Safety: Preventive safety controls are assessed and recorded.; Production: No production stop; controlled online test.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Proposed change Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priority Medium Status Completed Approval decision Approved Approval notes Scope, risks, test plan, and rollback path were reviewed and approved. Requested at Sep 29, 2026, 10:54 AM Approved at Sep 29, 2026, 10:54 AM Implementation notes The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Completed at Sep 29, 2026, 10:54 AM
Modification request
Modification request Completed Request number MOC-SAMPLE-004 Risk level Medium
⌄
Published details Request number MOC-SAMPLE-004 Scope Control software, related documents, execution tests, backup, and operator training. Reason Prevent product accumulation during line startup. Risk level Medium Risk controls and details Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impact Safety: Preventive safety controls are assessed and recorded.; Production: Dry test followed by a product test.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Proposed change Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priority High Status Completed Approval decision Approved Approval notes Scope, risks, test plan, and rollback path were reviewed and approved. Requested at Sep 29, 2026, 10:54 AM Approved at Sep 29, 2026, 10:54 AM Implementation notes The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Completed at Sep 29, 2026, 10:54 AM
Modification request
Modification request Completed Request number MOC-SAMPLE-005 Risk level Low
⌄
Published details Request number MOC-SAMPLE-005 Scope Control software, related documents, execution tests, backup, and operator training. Reason Give maintenance faster access to asset status. Risk level Low Risk controls and details Safety assessment, rollback copy, lockout/tagout, point-to-point testing, and client approval are mandatory. Impact Safety: Preventive safety controls are assessed and recorded.; Production: No effect on PLC logic or safety.; Technical: Logic, settings, documents, installed revision, and rollback plan are updated together.; Schedule: Execute in the approved maintenance window and issue the report within one working day.; Cost: Within the approved sample budget without a separate change order. Proposed change Implement in the controlled engineering environment, peer-review, simulate, back up, then test and record on site. Priority Low Status Completed Approval decision Approved Approval notes Scope, risks, test plan, and rollback path were reviewed and approved. Requested at Sep 29, 2026, 10:54 AM Approved at Sep 29, 2026, 10:54 AM Implementation notes The approved change was implemented, tests recorded, installed revision verified, and as-built documents updated. Completed at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from draft to submitted. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from submitted to under_review. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from under_review to approved. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from approved to implementing. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from implementing to completed. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from draft to submitted. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from submitted to under_review. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from under_review to approved. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from approved to implementing. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from implementing to completed. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from draft to submitted. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from submitted to under_review. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from under_review to approved. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from approved to implementing. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from implementing to completed. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from draft to submitted. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from submitted to under_review. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from under_review to approved. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from approved to implementing. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from implementing to completed. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from draft to submitted. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from submitted to under_review. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from under_review to approved. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from approved to implementing. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from implementing to completed. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Controlled revision associated with the change was linked to modification request MOC-SAMPLE-001. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Post-change test and acceptance report was linked to modification request MOC-SAMPLE-001. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Controlled revision associated with the change was linked to modification request MOC-SAMPLE-002. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Post-change test and acceptance report was linked to modification request MOC-SAMPLE-002. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Controlled revision associated with the change was linked to modification request MOC-SAMPLE-003. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Post-change test and acceptance report was linked to modification request MOC-SAMPLE-003. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Controlled revision associated with the change was linked to modification request MOC-SAMPLE-004. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Post-change test and acceptance report was linked to modification request MOC-SAMPLE-004. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Controlled revision associated with the change was linked to modification request MOC-SAMPLE-005. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Post-change test and acceptance report was linked to modification request MOC-SAMPLE-005. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM
Lifecycle event
Machine passport SAMPLE-LINE-01 was created. Occurred at Sep 29, 2026, 10:54 AM
⌄
Published details Occurred at Sep 29, 2026, 10:54 AM