Energy per Product: Combine Meter, PLC, Recipe, and Production Data
Energy per product becomes useful only when the energy numerator and production denominator describe the same boundary, time window and operating context. Meter readings, PLC states, recipe data and accepted output must be reconciled before the ratio is used for decisions.
Read article