PLC Code Review Checklist Before Factory Acceptance Testing
A pre-FAT code review finds ambiguous ownership, unsafe state transitions, hidden bypasses, weak diagnostics, and untestable interfaces before the factory floor becomes the test environment. The review should connect each finding to a requirement, revision, risk, owner, and FAT case.
Read article