A technician scanning a QR should quickly find the information they came for. Build a small, useful Project Passport first: a short introduction, the relevant equipment and the few files needed for the job.
Decide who will read it
For a maintenance handover, you might share an equipment summary, an installation guide and selected team members. That does not mean publishing the entire project. Leave commercial terms, credentials and unrelated working material out of the selection.
Check the source information
- Use existing, active project records and ready files. Confidential notes and topics are excluded from passport outputs.
- Decide whether you need a fixed snapshot or a live-content view. Keep the choice aligned with how the recipient will use the information.
- If a file should be downloadable publicly, plan that permission separately from simply displaying its information.
Create, preview and publish
- 01
Open Project Passports and choose New passport. Give it a recognizable name and a short description.
- 02
Select the executor and the allowed personal or company identity. Choose the team members and roles you actually want displayed.
- 03
Select the relevant sections, records and files. Enable public file downloads only where they are needed, then save.
- 04
Use the preview to read the result as a visitor. Saving a draft does not publish it: open Publication and publish the intended version.
- 05
Create the public access link or QR, then open it in a separate signed-out browser before printing or sharing it.
Verify the visitor’s view
The passport should show Published, and the independent visitor should see only the selected information. Test one permitted download and check what happens to access when the link is deactivated. Keep in mind that account identity details can update from their permitted source even when other passport content is a snapshot.
Why a QR may not show the expected content
- Still marked Unpublished? Review the Publication tab rather than repeatedly saving the draft.
- A file is listed but cannot be downloaded? Check the separate public-download choice and whether the source file remains available.
- A record is absent? Check its active state, confidentiality and your selection. A QR provides information; it does not grant a work permit or operate a machine.
Frequently asked questions
Does everyone in the project have to appear in the team section?
No. Choose the members you want to present and enter their relevant roles. Private contact details are not made public just by membership.
Will an old printed QR change when I edit a draft?
Editing a draft alone does not publish a new version. Review what its active public link is serving before relying on the printed label.
Can I share the QR image instead of printing it?
Yes. Both use the same public access link. Deactivating that link also stops access through the QR image.
Is a Project Passport a full offline backup?
No. It presents selected information. Use the separate handover/export process when you need a generated package.