The maintenance team needs today's project information. A handover meeting needs to identify which records were supplied at that point. Those are different uses, so choose the Passport mode before preparing the output.
What the two modes are for
Fixed project records do not mean every displayed detail is frozen. Permitted executor identity is updated from the profile, and deleted or restricted sources can be removed from public display.
| Mode | Purpose |
|---|---|
| Live | Show the current permitted state of selected content. |
| Snapshot | Keep the selected project records as captured for a version. |
Choose for a real recipient
A current reference for maintenance may suit Live. A record of a particular handover may suit Snapshot. A generated handover package is a separate output: changing a Passport does not rewrite that earlier package.
Check the public result before sending it
- 01
Identify the recipient and choose Live or Snapshot for that use.
- 02
Select the necessary sections, members and files; review public download permission separately from display.
- 03
Read the preview, save the version and check Publication status.
- 04
Open the link without signing in and test what the recipient can actually see and receive.
Keep publication reviewable
Creating a Passport does not publish it. If information should no longer be public, review publication and source access. A QR is a route to the link, not technical approval of the machine or entry to the whole private project.
Frequently asked questions
Does a company-name change reach a Snapshot?
Permitted personal or company identity updates apply; Snapshot fixes the selected project records.
Will every new file appear automatically?
The selection and mode of that Passport matter. Check the preview and published version for new content.
Does revoking publication delete a recipient's previous download?
No. It limits future access rather than removing files from other devices.
Can I save without publishing?
Yes. Prepare the Passport for review and publish only when the selected content is ready.