Use versioned checklist templates and runs to distinguish factory verification, site acceptance, pre-commissioning, panel checks, PLC/HMI tests, and network tests.
What this workflow records
Use versioned checklist templates and runs to distinguish factory verification, site acceptance, pre-commissioning, panel checks, PLC/HMI tests, and network tests. This guide uses the real execution records shown in AutoNexit and follows their connection to an accountable, reviewable outcome.
Prepare the project context
Before starting, identify the authorized project, the current source record, the person responsible for the next action, and the evidence needed to recognize completion. Read-only Sample projects are suitable for exploration but cannot be edited or converted into customer work.
- Open the authorized Workspace and intended Project.
- Confirm your role includes the section and action used in this workflow.
- Prepare only approved source records and evidence; never use the shared Sample for private data.
Follow the workflow
- 01
Select the checklist type and approved template version
- 02
Define source documents and acceptance criteria
- 03
Run each step with owner, time, result, comment, and attachment
- 04
Create a punch from any unresolved failure
- 05
Review and accept the completed run without rewriting history
Verify the recorded outcome
The record shows where a test occurred, which criteria applied, who observed it, and how each failure reached an accepted outcome. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page.
| Checkpoint | What to review | Expected record |
|---|---|---|
| Select the checklist type and approved template version | Before starting, identify the authorized project, the current source record, the person responsible for the next action, and the evidence needed to recognize completion. Read-only Sample projects are suitable for exploration but cannot be edited or converted into customer work. | The record shows where a test occurred, which criteria applied, who observed it, and how each failure reached an accepted outcome. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page. |
| Review and accept the completed run without rewriting history | Reusing one checklist for every stage hides different purposes; changing a template after execution breaks the evidence chain. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded. | Recorded test results support review but never replace site safety controls, calibrated instruments, competent personnel, or contractual acceptance authority. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes. |
Common failure modes
Reusing one checklist for every stage hides different purposes; changing a template after execution breaks the evidence chain. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded.
Engineering and security boundary
Recorded test results support review but never replace site safety controls, calibrated instruments, competent personnel, or contractual acceptance authority. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes.
Frequently asked questions
When should I use “FAT, SAT, and commissioning: distinct purposes and evidence”?
Use versioned checklist templates and runs to distinguish factory verification, site acceptance, pre-commissioning, panel checks, PLC/HMI tests, and network tests. This guide uses the real execution records shown in AutoNexit and follows their connection to an accountable, reviewable outcome.
What result should “FAT, SAT, and commissioning: distinct purposes and evidence” produce?
The record shows where a test occurred, which criteria applied, who observed it, and how each failure reached an accepted outcome. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page.
What should I check when “FAT, SAT, and commissioning: distinct purposes and evidence” does not work as expected?
Reusing one checklist for every stage hides different purposes; changing a template after execution breaks the evidence chain. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded.
What does “FAT, SAT, and commissioning: distinct purposes and evidence” deliberately not do?
Recorded test results support review but never replace site safety controls, calibrated instruments, competent personnel, or contractual acceptance authority. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes.