Use a versioned Sample checklist to record one failed FAT step, attach evidence, assign a punch, review correction, retest, and close without erasing the failure.
What this workflow records
Use a versioned Sample checklist to record one failed FAT step, attach evidence, assign a punch, review correction, retest, and close without erasing the failure. This guide uses the real execution records shown in AutoNexit and follows their connection to an accountable, reviewable outcome.
Prepare the project context
Before starting, identify the authorized project, the current source record, the person responsible for the next action, and the evidence needed to recognize completion. Read-only Sample projects are suitable for exploration but cannot be edited or converted into customer work.
- Open the authorized Workspace and intended Project.
- Confirm your role includes the section and action used in this workflow.
- Prepare only approved source records and evidence; never use the shared Sample for private data.
Follow the workflow
- 01
Select the approved FAT checklist version
- 02
Record the failed step with comment and attachment
- 03
Assign priority, discipline, and owner
- 04
Submit correction for review and reopen if rejected
- 05
Retest and accept the final close-out
Verify the recorded outcome
The completed trail preserves template version, failure, evidence, ownership, review decision, retest, and closure. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page.
| Checkpoint | What to review | Expected record |
|---|---|---|
| Select the approved FAT checklist version | Before starting, identify the authorized project, the current source record, the person responsible for the next action, and the evidence needed to recognize completion. Read-only Sample projects are suitable for exploration but cannot be edited or converted into customer work. | The completed trail preserves template version, failure, evidence, ownership, review decision, retest, and closure. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page. |
| Retest and accept the final close-out | Editing the original result to Pass or closing before reviewer acceptance makes the final report misleading. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded. | The Sample demonstrates traceability and does not replace contractual FAT procedures, witness requirements, or safe test execution. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes. |
Common failure modes
Editing the original result to Pass or closing before reviewer acceptance makes the final report misleading. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded.
Engineering and security boundary
The Sample demonstrates traceability and does not replace contractual FAT procedures, witness requirements, or safe test execution. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes.
Frequently asked questions
When should I use “Worked example: turn a failed FAT step into a traceable punch close-out”?
Use a versioned Sample checklist to record one failed FAT step, attach evidence, assign a punch, review correction, retest, and close without erasing the failure. This guide uses the real execution records shown in AutoNexit and follows their connection to an accountable, reviewable outcome.
What result should “Worked example: turn a failed FAT step into a traceable punch close-out” produce?
The completed trail preserves template version, failure, evidence, ownership, review decision, retest, and closure. Confirm the status, timestamps, ownership, linked evidence, and downstream references before leaving the page.
What should I check when “Worked example: turn a failed FAT step into a traceable punch close-out” does not work as expected?
Editing the original result to Pass or closing before reviewer acceptance makes the final report misleading. If a permission, capacity, stale-version, or synchronization message appears, resolve that condition instead of repeating the operation or assuming it succeeded.
What does “Worked example: turn a failed FAT step into a traceable punch close-out” deliberately not do?
The Sample demonstrates traceability and does not replace contractual FAT procedures, witness requirements, or safe test execution. Keep operational authorization, safety review, manufacturer instructions, and customer acceptance in their approved processes.