Automation handover: check what the next team needs

Share

The day after handover, the receiving team must be able to find the right file and understand what remains open. A full folder or signed meeting note cannot do that alone. Use a short set of checks that lead to usable results.

Agree the delivery list with the recipient

  • Define the equipment, files and records expected before handover day.
  • Give incomplete items an owner, next action and agreed date.
  • Test access with the type of account or authorized link the recipient will use.

Read file designations accurately

Installed and Reference may point to different revisions. Review both, and do not treat Working as test approval. For backups, keep a verified recovery result; the existence of a ZIP is not enough.

Investigate incomplete checks before generating the output.
Handover readiness and generated packages

Investigate incomplete checks before generating the output.

Run the final checks

  1. 01

    Open Handover readiness and follow the reason for each failed check.

  2. 02

    Review reference files, active installations, verified backups and completed commissioning checklists.

  3. 03

    Resolve critical and high-priority open items through the project's agreed process.

  4. 04

    Generate the package, wait for actual readiness and reconcile the downloaded contents with the delivery list.

Match the installed revision to its file and equipment.
Installed versions linked to the project

Match the installed revision to its file and equipment.

Separate the package from technical acceptance

Readiness is calculated from recorded information. Physical installation quality, safety authorization and contractual acceptance require the appropriate responsible people. Retain the generated package with its version so a future reader can identify what was delivered.

Frequently asked questions

Does a Working designation prevent handover?

No. It is independent; review actual readiness requirements and Installed/Reference separately.

What if a source file changes after package generation?

The existing package stays unchanged. Prepare a new identifiable output for a revised delivery.

Can a minor defect remain open?

That depends on the agreed acceptance process. Record the responsibility and agreement instead of hiding the issue.

Is a queued package ready to send?

Not yet. Verify successful generation and that the package itself can be downloaded.