Super administrators can send individual emails through the configured SMTP service and review incoming messages in a dedicated inbox.
What changed
- The inbox checks a configured secure IMAP mailbox in small scheduled batches, with unread badges, drafts, reply and forward, read controls, archiving and recoverable trash.
- Document revision uploads now have a cleaner introduction and a compact software-version field.
Engineering teams can build private, project-scoped network diagrams beside their equipment and industrial-network registers.
What changed
- Create and edit linked nodes, branches, notes, images, attachments and register references on a responsive canvas, with autosave and version-conflict protection.
- Organize maps, restore deleted designs and export a diagram in image, document or structured-text formats.
New revisions can reuse the project’s engineering software details and receive a suggested revision number.
What changed
- Choose a defined software product, version, and update or service pack, or enter custom values for each field. The revision number advances by one tenth and remains editable.
- The date picker in the new-document dialog is now usable above its modal window.
The notification badge inside a project now counts only unread notifications for that project.
What changed
- Account-wide unread notifications no longer appear on a project’s sidebar badge. The count resets and refreshes when moving between a project and the general application area.
Project documents now use a clearer two-row card layout that stays readable on smaller screens.
What changed
- Each card groups the creator photo, document title, status and actions above its number, current revision, type and last-change date. A visible sort control preserves ordering by number, title or update time.
Project documents are easier to scan and their preview opens from any key identifier.
What changed
- The creator appears as a profile photo beside the document title, with their full name on hover. Document number and current revision now open the same preview as the title.
- Document filters and records adapt to the available panel width. Delivery history shows the full stored message without an extra notice.
Project participants are easier to find in task assignment, and administrators can open saved delivery content in full.
What changed
- Task assignment clearly lists active project members and workspace managers with project access, marking people without task access; document creator profiles fit neatly beside the record.
- Email, bot and browser-push histories offer a full-detail view of newly saved message text and a direct link to the recipient account. Security codes and private links remain protected.
Project contributors are visible beside their work, and administrators can review email, bot and browser-push delivery histories.
What changed
- Notebook, revision, lifecycle and passport views show the contributor profile; task assignment includes eligible project members.
- New project uploads consume the project manager’s storage allowance while preserving the uploader’s identity. Delivery histories include attempts, outcomes and older pages.
Project and membership invitations can be cancelled from their history, with clearer controls on repeat email delivery.
What changed
- Managers can cancel a pending project or membership invitation; cancelled invitation links stop working immediately.
- Each invitation email is sent at most once per issue, and another project-invitation email cannot be requested immediately after the previous one.
Project invitations now have a status history, while administrators can review recent email and Telegram bot deliveries.
What changed
- The Add User page shows recent project and membership invitations with their current status.
- Invitations to existing members use email and the available browser and Telegram notification channels; administrators can review the last 30 recorded deliveries for each message channel.