info@autonexit.com

Working Hours: 9:00 AM to 5:00 PM

Pepperl+Fuchs Ultrasonic Sensor with S7-1200 PLC & TIA Portal – Full Tutorial

Pepperl+Fuchs Ultrasonic Sensor with S7-1200 PLC & TIA Portal – Full Tutorial


Warning: Undefined array key "cc_load_policy" in /home/autonexit/public_html/wp-content/plugins/elementor/includes/widgets/video.php on line 1253

In this full hands-on tutorial, I show you how to wire, configure, and program a Pepperl+Fuchs ultrasonic sensor with a Siemens S7-1200 PLC inside TIA Portal.

Here’s what you’ll learn in this video:

• Unboxing the Pepperl+Fuchs ultrasonic sensor
• Understanding the sensor’s dead band (0–70 mm) and working range (70–1000 mm)
• Reviewing the datasheet: sensing range, adjustment range, modes, sync pin, and teach input
• Wiring the analog output (4–20 mA) correctly to the S7-1200 analog input
• Power wiring (brown → +24V, blue → 0V)
• Function of the black wire (analog output), white wire (teach), and gray wire (sync)
• How the sensor behaves when detecting objects at different distances
• Setting up the PLC analog channel and reading real-time values in TIA Portal

This tutorial is perfect for anyone working with industrial sensors, automation projects, or Siemens PLCs — clear, practical, and beginner-friendly.

Liam Siahtiri

Liam Siahtiri

I’m passionate about PLCs and industrial automation, with a focus on complex programming, communication protocols, and SCADA systems. My goal is to develop practical, project-based training to fill the gap in industry education and give back to the field that shaped my growth. I hold a Master’s degree in Electrical Power Engineering.
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Recently comments
  • Raja : Good day EhsanThanks for uploading. May i have the password to the uploaded rar file. Regards Raja
  • Liam Siahtiri : Hi, It's: autonexit.com
  • MEETKUMAR Sandipbhai PATEL : Good day Ehsan . Thanks for uploading. I don't know why I am not able to install and extract a folder can you guide me plz?