+989123874216

Free consultation

info@autonexit.com

Working Hours: 9:00 AM to 5:00 PM

Home

24/7 Support – We're Always by Your Side

No More Worries About Production Downtime

All our projects come with up to 6 months of 24/7 support and warranty, so you can focus on productivity and quality with peace of mind.
Home

Our Projects Speak for Our Capabilities

Our Portfolio Reflects the Depth of Our Expertise

From small-scale operations to large oil & gas developments, the quality and experience of our team is fully demonstrated in the execution of complex industrial projects.
Why should you choose us?

Our mission is to drive the smart evolution of your industry

We help optimize your production lines, facilities, and industrial processes—making them smarter, safer, and more efficient. By combining cutting-edge technology with deep engineering knowledge and hands-on experience in large-scale projects, we design systems that are resilient to failure, adaptable to change, and built to boost productivity.

Comprehensive Industrial Automation Solutions

Design, development, and optimization of control systems including PLC, HMI, and SCADA – based on Siemens platforms.

Modernizing Legacy Systems

Reverse engineering and upgrading legacy systems using modern hardware and software to restore reliability and ensure long-term maintainability.

Smart Productivity Enhancement

Advanced performance monitoring and data analytics to optimize operational efficiency and energy usage.

Scalable & Flexible Infrastructure

Establishing reliable communication networks (PROFINET, PROFIBUS, Modbus) and redundant architectures for large-scale and mission-critical projects.

Our Work Process

Our project workflow follows professional practices and global standards.

Technical Analysis & Needs Assessment

In-depth analysis of the client’s industrial processes, evaluation of existing infrastructure, and identification of improvement areas based on international standards.

01

Solution Design & Goal Setting

Selection of optimal control and network architecture, defining performance, safety, and productivity goals, and planning for precise and forward-looking project execution.

02

Implementation & Results

System installation, commissioning, and full testing along with accurate performance reports, energy optimization, and guaranteed fast return on investment for the client.

03
22

Team Members

12

Years of Experience

7

Ongoing Projects

89

Completed Projects

Our professional services

From industrial automation design and implementation to expert commissioning.

Control

Designing precise and reliable control systems (PLC/DCS) to enhance accuracy, safety, and flexibility in production lines.

Monitoring

Real-time monitoring of processes using HMI /SCADA systems to enable fast, timely, and informed decision-making.

Productivity

Improving uptime and reducing costs through process optimization and elimination of unnecessary downtimes.

Our latest articles

Read and learn the best tricks and the best content in high quality

What do customers say about us

Real feedback from our clients, reflecting the quality of our services and our commitment to delivering results.

Brands That Trusted Our Expertise — From Small Industries to Major Names

Download

Please insert information