AutoNexit Training 3 min readAT-07

Keep working, installed and reference files clear

Share

You may be developing revision 3 while revision 2 is installed and revision 1 remains the reference. AutoNexit can record all three facts. You do not have to call one file final and hope the team knows what that means.

One controlled file, several revisions

The controlled file is the named entry, such as Packaging-line PLC program. Its revisions are the uploaded files under that entry. Uploading another revision adds to the history; it does not replace the bytes of an earlier upload.

Know what each designation means

  • Working: a revision selected for ongoing development. A successfully uploaded new revision receives it automatically.
  • Installed: the revision currently recorded as installed for the relevant file or target.
  • Reference: the chosen revision for consultation or comparison. It may be older than the installed one.
Open one file to see its separate uploaded revisions.
Controlled file register

Open one file to see its separate uploaded revisions.

Upload and label the revision

  1. 01

    Open Revision control and select the existing controlled file, or create a new entry if this is a different file.

  2. 02

    Choose Upload new revision. Enter the revision details, select the file and wait for upload and verification to finish.

  3. 03

    Open Manage designations on that revision. Select Working, Installed and Reference independently; any combination, including none, is allowed.

  4. 04

    Review the replacement notice when selecting a new Installed or Reference revision, then save the designations.

  5. 05

    Read the timeline again. Check that the intended revision has each designation; designation changes do not select a different current revision.

Installation is one recorded choice, separate from the reference.
Installed revision records

Installation is one recorded choice, separate from the reference.

Try the three-version example

You should be able to identify revision 1 as Reference, revision 2 as Installed and revision 3 as Working without opening every file. Installed and Reference each have one active choice per controlled file; choosing a replacement leaves the other designations alone. Download a historical revision when you need that exact file.

Do not confuse a label with a technical approval

  • These designations have no required order and do not prove that testing or approval took place.
  • If saving reports a newer version, reload and review the other person’s changes before trying again.
  • AutoNexit does not read backups from a PLC. Create the file using your engineering tools, then upload it. Permanent deletion is a separate, warned action, not a way to replace a revision.

Frequently asked questions

Can one revision have all three designations?

Yes. For example, the installed revision can also be the one you are developing and consulting as your reference.

What happens if I clear Installed?

The active installed choice is removed. Another revision is not selected automatically.

Are the old Tested and Approved events lost?

No. Existing technical events remain in history; they are no longer steps you must complete to use the three current designations.

Does marking a revision as Reference publish it?

No. Public visibility and downloads require separate, explicit publication choices.

Related articles

PB-02

A practical PLC and HMI backup strategy

Record what was backed up, where it came from, which installed revision it supports, when it was verified, and when the next recoverability check is due.