AutoNexit Training 3 min readAT-04

Turn commissioning work into clear, manageable tasks

Share

Check the panel is too vague to hand to a colleague. Check the emergency-stop feedback on panel CP-01 tells them what to do. A useful task makes the action, responsible person and result easy to understand.

Keep one main record for the work

For a panel test, group related actions under a topic such as Panel checks. Each task holds its own description, assignees and progress. Chat can discuss the work, but the final result belongs with the task so it is easy to find later.

Decide what completion looks like

  • Name the item to check and the evidence you expect, such as a test result or photo.
  • Confirm the intended assignee has joined the project and can access its tasks.
  • Use General for an isolated action; create a custom topic for a related group of tasks.
Read each card’s action and status within its topic.
Project task board

Read each card’s action and status within its topic.

Create the task and move it as work progresses

  1. 01

    Open Project tasks and select the relevant topic, then choose Add task.

  2. 02

    Write an action in the title. In Description, explain the location, expected result and any useful reference.

  3. 03

    Select the responsible members, priority and a realistic due date if needed. Save to add the task.

  4. 04

    Open the saved task when you need to add evidence or discuss its result. Move it between To do, In progress, Waiting and Done to reflect the work.

  5. 05

    If the task belongs elsewhere, assign it to the correct topic. Use a reminder only when someone needs an extra prompt at a specific time.

Use conversation for coordination and record the final outcome on the task.
Project team conversation

Use conversation for coordination and record the final outcome on the task.

Check the task in its topic

The task should appear under the chosen topic, with the intended assignees and status. After testing, record what was actually observed before marking it Done. Moving a card is a record of progress; it does not perform the physical test.

When the board becomes confusing

  • A card seems missing? Check the current topic, search, filters and archive.
  • A person cannot be assigned? Check membership and topic visibility; a task cannot be assigned to someone barred from that topic.
  • Repeated reminders usually create noise. Update the original task instead of creating several records for the same action.

Frequently asked questions

Does setting a due date guarantee a Telegram message?

No. External delivery depends on the supported event, the person’s notification preferences and their active connection.

Can I remove a topic from the public passport?

A topic hidden from any selected project member is treated as confidential and excluded from passport outputs.

What is Waiting for?

It makes a blocked action visible, for example when work depends on a part or a customer response. Explain the blocker in the task.

Does Done close the whole project?

No. It changes that task’s status; other project work and handover checks remain separate.