New to AutoNexit? You do not need to fill in every section on day one. First look around a Sample project, then create one small project and add a useful record.
Look at one task and one file
On Projects, open a Sample in a language you know. Pick a task and follow its title, owner and status. Then open Revision control and look at a file’s history. These two examples show how work and files belong to a project.
Have a name and a client ready
- Choose a real job, such as replacing a packaging-line control panel.
- Check which client it belongs to. If that client is missing, add it from Clients before creating the project.
- Use Sample data only for learning. Samples are shared and cannot be edited.
Create your own project
- 01
Return to Projects and choose New project. You are creating a separate record, not editing the Sample.
- 02
Select the client and an appropriate category. Enter a clear title, such as Packaging line — control-panel replacement.
- 03
Choose a status that reflects the work today. Add dates and a short description if you already know them, then save.
- 04
Open the new project and add one note describing its purpose. Invite colleagues when you are ready to work together.
Check the result
Return to the project list and find your new title. Open it again: the client and status should be yours, and the note should still be there. That is enough for a useful first session; the engineering registers can wait until you need them.
If something is missing
- No edit button in the Sample? That is expected. Return to your own project.
- Cannot find your project? Clear the list’s search and filters before creating another one.
- A colleague cannot enter? Check their accepted invitation and section access rather than sharing your account.
Frequently asked questions
Will closing the Samples hide my own projects?
No. The Samples area has its own show/hide control. Your normal project list remains available.
Do I have to finish the whole setup at once?
No. Start with the information you know and complete the relevant sections as the job develops.
Does the project status prove that a machine is safe?
No. It records a team decision. Field checks and safety authorization still belong to qualified people.
Can I use AutoNexit before inviting anyone?
Yes. You can organize your work first and add the team later.