+989123874216

Free consultation

info@autonexit.com

Working Hours: 9:00 AM to 5:00 PM

Download Siemens TIA Portal V20 Free + Installation Guide

Download Siemens TIA Portal V20 Free + Installation Guide

Download Siemens TIA Portal V20 Free + Installation Guide

TIA Portal stands for Totally Integrated Automation Portal – a comprehensive engineering framework developed by Siemens to simplify the programming, configuration, and diagnostics of industrial automation systems. It integrates multiple tools in a single platform, allowing users to work on PLC programming, HMI design, network configuration, motion control, and even SCADA systems — all from one interface.

Originally introduced to replace the older STEP 7 and WinCC tools, TIA Portal offers a modern, user-friendly, and scalable environment tailored for both small and large-scale industrial applications.

Key Features of TIA Portal

All-in-One Platform
TIA Portal merges various automation tasks under one roof — PLC logic, HMI design, drives, safety, motion, and diagnostics.
User-Friendly Interface
Its drag-and-drop interface and intuitive layout reduce engineering time and improve project clarity.
Seamless Integration
Full integration with Siemens hardware, including S7-1200, S7-1500, ET 200, HMI Comfort Panels, and SINAMICS drives.
Advanced Diagnostics
Real-time system diagnostics help in early detection and correction of errors.
Multi-language Support
Engineers across the world can work in their native languages.

What Can You Do with TIA Portal?

1. PLC Programming
Write and simulate automation logic using Ladder (LAD), Function Block Diagram (FBD), or Structured Control Language (SCL).
2. HMI Design
Create user interfaces for Siemens HMI panels with screen navigation, buttons, graphs, and data logging.
3. Network Configuration
Configure PROFINET, PROFIBUS, and other industrial networks easily.
4. Motion Control
Implement positioning and speed control systems using Siemens servo drives.
5. Safety Programming
Develop safety logic using safety CPUs and adhere to SIL/PL standards.
6. Data Logging & SCADA Integration
Monitor and store critical process data with WinCC Runtime or WinCC Professional.

System Requirements for TIA Portal

Operating System (64-bit only)

  • Windows 10 (Professional, Enterprise, Education) – Version 21H2 or higher
  • Windows 11 (Professional, Enterprise, Education) – Recommended
  • Windows Server 2019 / 2022 – Optional for enterprise setups

Hardware Requirements

4/5 (7 Reviews)
Ehsan Siahtiri

Ehsan Siahtiri

I’m passionate about PLCs and industrial automation, with a focus on complex programming, communication protocols, and SCADA systems. My goal is to develop practical, project-based training to fill the gap in industry education and give back to the field that shaped my growth. I hold a Master’s degree in Electrical Power Engineering.
Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments
Recently comments

    Download

    Please insert information