Open a section to review its published records. Technical detail stays folded until you need it.
01Project Notebook9 Published records⌄
Notebook page
项目主页
Notebook page
项目简报
改造包装线 2,同时保持受控生产移交和可审计的安装状态。
Notebook page
范围与要求
Notebook page
现场勘察
记录已核实的现场条件、限制、进场安排、照片和跟进负责人。
Notebook page
会议记录
将决策、行动、负责人、期限和待决问题关联到项目记录。
Notebook page
工程决策
记录每项重要工程选择的背景、备选方案、决定、批准人和影响。
Notebook page
现场日报
记录已完成工作、在场人员、测试、阻碍以及班次结束状态。
Notebook page
调试记录
Notebook page
移交记录
跟踪已安装修订版、备份、培训、未决例外、交付物和最终职责。
02Project tasks4 Published records⌄
Topic: 工程设计
Task
审核 I/O 清单
DonePriorityHighDue atJun 7, 2026, 4:00 PM
⌄
Published details
- Status
- Done
- Priority
- High
- Starts at
- Jun 1, 2026, 7:30 AM
- Due at
- Jun 7, 2026, 4:00 PM
Task
批准网络架构
In progressPriorityMediumDue atJun 8, 2026, 4:00 PM
⌄
与现场团队确认地址、VLAN 和 PROFINET 名称。
Published details
- Status
- In progress
- Priority
- Medium
- Starts at
- Jun 1, 2026, 7:30 AM
- Due at
- Jun 8, 2026, 4:00 PM
Topic: 安装与调试
Task
测试压力信号回路
WaitingPriorityUrgentDue atJun 9, 2026, 4:00 PM
⌄
核对压力变送器从现场到 PLC 的原始值和工程值。
Published details
- Status
- Waiting
- Priority
- Urgent
- Starts at
- Jun 1, 2026, 7:30 AM
- Due at
- Jun 9, 2026, 4:00 PM
Topic: 移交
Task
准备移交包
To doPriorityHighDue atJun 10, 2026, 4:00 PM
⌄
Published details
- Status
- To do
- Priority
- High
- Starts at
- Jun 1, 2026, 7:30 AM
- Due at
- Jun 10, 2026, 4:00 PM
03Engineering registers179 Published records⌄
Equipment
15⌄
Equipment
Equipment
ActiveTagPLC-101Name主线控制器ManufacturerSiemensModelS7-1515-2 PN
⌄
Published details
- Tag
- PLC-101
- Name
- 主线控制器
- Equipment type
- PLC
- Manufacturer
- Siemens
- Model
- S7-1515-2 PN
- Part number
- 6ES7515-2AM02-0AB0
- Serial number
- SMP-2026-00001
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 生产线控制
- Description
- 主线控制器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 1, 2026, 12:00 AM
- Commissioning date
- May 1, 2026, 12:00 AM
- Warranty expiry
- May 1, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagHMI-101Name主操作面板ManufacturerSiemensModelTP1200 Comfort
⌄
Published details
- Tag
- HMI-101
- Name
- 主操作面板
- Equipment type
- hmi
- Manufacturer
- Siemens
- Model
- TP1200 Comfort
- Part number
- 6AV2124-0MC01-0AX0
- Serial number
- SMP-2026-00002
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 操作员界面
- Description
- 主操作面板;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 2, 2026, 12:00 AM
- Commissioning date
- May 2, 2026, 12:00 AM
- Warranty expiry
- May 2, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagVFD-201Name进料输送机变频器ManufacturerSiemensModelSINAMICS G120
⌄
Published details
- Tag
- VFD-201
- Name
- 进料输送机变频器
- Equipment type
- drive
- Manufacturer
- Siemens
- Model
- SINAMICS G120
- Part number
- 6SL3210-1KE23-2UF1
- Serial number
- SMP-2026-00003
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 产品输送
- Description
- 进料输送机变频器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 3, 2026, 12:00 AM
- Commissioning date
- May 3, 2026, 12:00 AM
- Warranty expiry
- May 3, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagVFD-202Name出料输送机变频器ManufacturerSiemensModelSINAMICS G120
⌄
Published details
- Tag
- VFD-202
- Name
- 出料输送机变频器
- Equipment type
- drive
- Manufacturer
- Siemens
- Model
- SINAMICS G120
- Part number
- 6SL3210-1KE21-7UF1
- Serial number
- SMP-2026-00004
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 产品输送
- Description
- 出料输送机变频器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 4, 2026, 12:00 AM
- Commissioning date
- May 4, 2026, 12:00 AM
- Warranty expiry
- May 4, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagRIO-101Name远程 I/O 站ManufacturerSiemensModelET 200SP
⌄
Published details
- Tag
- RIO-101
- Name
- 远程 I/O 站
- Equipment type
- remote_io
- Manufacturer
- Siemens
- Model
- ET 200SP
- Part number
- 6ES7155-6AU01-0BN0
- Serial number
- SMP-2026-00005
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 过程 I/O
- Description
- 远程 I/O 站;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 5, 2026, 12:00 AM
- Commissioning date
- May 5, 2026, 12:00 AM
- Warranty expiry
- May 5, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagSW-CTRL-01Name控制网络管理型交换机ManufacturerSiemensModelSCALANCE XC208
⌄
Published details
- Tag
- SW-CTRL-01
- Name
- 控制网络管理型交换机
- Equipment type
- network_switch
- Manufacturer
- Siemens
- Model
- SCALANCE XC208
- Part number
- 6GK5208-0BA00-2AC2
- Serial number
- SMP-2026-00006
- Location
- 包装车间主控制柜
- Panel
- MCC-01
- System
- 工业网络
- Description
- 控制网络管理型交换机;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 6, 2026, 12:00 AM
- Commissioning date
- May 6, 2026, 12:00 AM
- Warranty expiry
- May 6, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagPT-201Name管线压力变送器ManufacturerEndress+HauserModelCerabar PMP51
⌄
Published details
- Tag
- PT-201
- Name
- 管线压力变送器
- Equipment type
- sensor
- Manufacturer
- Endress+Hauser
- Model
- Cerabar PMP51
- Part number
- PMP51-AA21JA1PGJ
- Serial number
- SMP-2026-00007
- Location
- 包装车间一号生产线
- Panel
- FIELD-01
- System
- 过程仪表
- Description
- 管线压力变送器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 7, 2026, 12:00 AM
- Commissioning date
- May 7, 2026, 12:00 AM
- Warranty expiry
- May 7, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagLT-101Name储罐液位变送器ManufacturerEndress+HauserModelLevelflex FMP51
⌄
Published details
- Tag
- LT-101
- Name
- 储罐液位变送器
- Equipment type
- sensor
- Manufacturer
- Endress+Hauser
- Model
- Levelflex FMP51
- Part number
- FMP51-AAAACAA
- Serial number
- SMP-2026-00008
- Location
- 包装车间一号生产线
- Panel
- FIELD-01
- System
- 过程仪表
- Description
- 储罐液位变送器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 8, 2026, 12:00 AM
- Commissioning date
- May 8, 2026, 12:00 AM
- Warranty expiry
- May 8, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagXV-101Name进料紧急切断阀ManufacturerFestoModelDAPS-0080
⌄
Published details
- Tag
- XV-101
- Name
- 进料紧急切断阀
- Equipment type
- actuator
- Manufacturer
- Festo
- Model
- DAPS-0080
- Part number
- DAPS-0080-090-R-F0507
- Serial number
- SMP-2026-00009
- Location
- 包装车间一号生产线
- Panel
- FIELD-01
- System
- 控制阀
- Description
- 进料紧急切断阀;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 9, 2026, 12:00 AM
- Commissioning date
- May 9, 2026, 12:00 AM
- Warranty expiry
- May 9, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagMTR-201Name主输送机电机ManufacturerABBModelM3AA 132S
⌄
Published details
- Tag
- MTR-201
- Name
- 主输送机电机
- Equipment type
- actuator
- Manufacturer
- ABB
- Model
- M3AA 132S
- Part number
- 3GAA132001-ASE
- Serial number
- SMP-2026-00010
- Location
- 包装车间一号生产线
- Panel
- FIELD-01
- System
- 产品输送
- Description
- 主输送机电机;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 10, 2026, 12:00 AM
- Commissioning date
- May 10, 2026, 12:00 AM
- Warranty expiry
- May 10, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagPANEL-101Name主控制柜ManufacturerRittalModelVX25
⌄
Published details
- Tag
- PANEL-101
- Name
- 主控制柜
- Equipment type
- control_panel
- Manufacturer
- Rittal
- Model
- VX25
- Part number
- VX 8806.000
- Serial number
- SMP-2026-00011
- Location
- 包装车间一号生产线
- Panel
- MCC-01
- System
- 配电与控制
- Description
- 主控制柜;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 11, 2026, 12:00 AM
- Commissioning date
- May 11, 2026, 12:00 AM
- Warranty expiry
- May 11, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagENG-101Name项目工程师站ManufacturerDellModelPrecision 3680
⌄
Published details
- Tag
- ENG-101
- Name
- 项目工程师站
- Equipment type
- engineering_station
- Manufacturer
- Dell
- Model
- Precision 3680
- Part number
- PRECISION-3680-I7
- Serial number
- SMP-2026-00012
- Location
- 包装车间一号生产线
- Panel
- MCC-01
- System
- 工程与维护
- Description
- 项目工程师站;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 12, 2026, 12:00 AM
- Commissioning date
- May 12, 2026, 12:00 AM
- Warranty expiry
- May 12, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagUPS-101Name控制不间断电源ManufacturerSchneider ElectricModelSmart-UPS SRT
⌄
Published details
- Tag
- UPS-101
- Name
- 控制不间断电源
- Equipment type
- ups
- Manufacturer
- Schneider Electric
- Model
- Smart-UPS SRT
- Part number
- SRT3000XLI
- Serial number
- SMP-2026-00013
- Location
- 包装车间一号生产线
- Panel
- MCC-01
- System
- 控制电源
- Description
- 控制不间断电源;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 13, 2026, 12:00 AM
- Commissioning date
- May 13, 2026, 12:00 AM
- Warranty expiry
- May 13, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagSAFE-101Name产线安全控制器ManufacturerPilzModelPNOZmulti 2
⌄
Published details
- Tag
- SAFE-101
- Name
- 产线安全控制器
- Equipment type
- safety_system
- Manufacturer
- Pilz
- Model
- PNOZmulti 2
- Part number
- 772100
- Serial number
- SMP-2026-00014
- Location
- 包装车间一号生产线
- Panel
- MCC-01
- System
- 机器安全
- Description
- 产线安全控制器;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 14, 2026, 12:00 AM
- Commissioning date
- May 14, 2026, 12:00 AM
- Warranty expiry
- May 14, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Equipment
Equipment
ActiveTagVISION-101Name质量检测视觉系统ManufacturerCognexModelIn-Sight 7905
⌄
Published details
- Tag
- VISION-101
- Name
- 质量检测视觉系统
- Equipment type
- vision_system
- Manufacturer
- Cognex
- Model
- In-Sight 7905
- Part number
- IS7905M-363-50
- Serial number
- SMP-2026-00015
- Location
- 包装车间一号生产线
- Panel
- FIELD-01
- System
- 质量控制
- Description
- 质量检测视觉系统;示例设备已记录完整技术数据、安装位置和调试历史。
- Status
- Active
- Installation date
- Apr 15, 2026, 12:00 AM
- Commissioning date
- May 15, 2026, 12:00 AM
- Warranty expiry
- May 15, 2028, 12:00 AM
- Notes
- 铭牌、接线、接地、配置版本和制造商文件均已审核归档。
Software
7⌄
Software
Software
verifiedName产线控制程序
⌄
Published details
- Name
- 产线控制程序
- Vendor
- Siemens
- Product
- TIA Portal
- Version
- V19.0
- Update / service pack
- Update 3
- Firmware version
- V3.1.0
- License type
- Engineering Floating
- Installed on
- PLC-101
- Last verified date
- Jun 10, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName操作面板项目
⌄
Published details
- Name
- 操作面板项目
- Vendor
- Siemens
- Product
- WinCC Unified
- Version
- V19.0
- Update / service pack
- Update 3
- Firmware version
- V19.0.0.3
- License type
- Runtime Advanced
- Installed on
- HMI-101
- Last verified date
- Jun 11, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName变频器调试参数
⌄
Published details
- Name
- 变频器调试参数
- Vendor
- Siemens
- Product
- Startdrive
- Version
- V19.0
- Update / service pack
- HF2
- Firmware version
- V4.7.13
- License type
- Engineering
- Installed on
- VFD-201
- Last verified date
- Jun 12, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName工业网络配置
⌄
Published details
- Name
- 工业网络配置
- Vendor
- Siemens
- Product
- PRONETA Professional
- Version
- V3.7
- Update / service pack
- SP1
- Firmware version
- V3.7.1
- License type
- Professional
- Installed on
- SW-CTRL-01
- Last verified date
- Jun 13, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName机器安全逻辑
⌄
Published details
- Name
- 机器安全逻辑
- Vendor
- Pilz
- Product
- PNOZmulti Configurator
- Version
- V11.4
- Update / service pack
- Build 184
- Firmware version
- V2.6.2
- License type
- Basic
- Installed on
- SAFE-101
- Last verified date
- Jun 14, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName机器视觉配置
⌄
Published details
- Name
- 机器视觉配置
- Vendor
- Cognex
- Product
- In-Sight Explorer
- Version
- V6.4.1
- Update / service pack
- Patch 2
- Firmware version
- V6.4.1.2
- License type
- Offline Programming
- Installed on
- VISION-101
- Last verified date
- Jun 15, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
Software
Software
verifiedName备份版本管理
⌄
Published details
- Name
- 备份版本管理
- Vendor
- AutoNexit
- Product
- Revision Vault Exporter
- Version
- V1.11
- Update / service pack
- Release 2026.09
- Firmware version
- V1.11.0
- License type
- Project
- Installed on
- ENG-101
- Last verified date
- Jun 16, 2026, 12:00 AM
- Notes
- 已核对安装介质、许可证、软件版本和固件兼容性,以支持受控恢复。
- Status
- verified
I/O point
150⌄
I/O point
I/O point
ActiveTagDI-001
⌄
Published details
- Tag
- DI-001
- Description
- 示例产线 DI 点 001,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 0
- Address
- I0.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-002
⌄
Published details
- Tag
- DO-002
- Description
- 示例产线 DO 点 002,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 1
- Address
- Q0.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-003
⌄
Published details
- Tag
- AI-003
- Description
- 示例产线 AI 点 003,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 2
- Address
- IW68
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-004
⌄
Published details
- Tag
- AO-004
- Description
- 示例产线 AO 点 004,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 3
- Address
- QW70
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-005
⌄
Published details
- Tag
- RTD-005
- Description
- 示例产线 RTD 点 005,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 4
- Address
- IW72
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-006
⌄
Published details
- Tag
- PULSE-006
- Description
- 示例产线 PULSE 点 006,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 5
- Address
- Q0.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-007
⌄
Published details
- Tag
- DI-007
- Description
- 示例产线 DI 点 007,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 6
- Address
- I0.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-008
⌄
Published details
- Tag
- DO-008
- Description
- 示例产线 DO 点 008,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 7
- Address
- Q0.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-009
⌄
Published details
- Tag
- AI-009
- Description
- 示例产线 AI 点 009,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 8
- Address
- IW80
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-010
⌄
Published details
- Tag
- AO-010
- Description
- 示例产线 AO 点 010,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 9
- Address
- QW82
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-011
⌄
Published details
- Tag
- RTD-011
- Description
- 示例产线 RTD 点 011,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 10
- Address
- IW84
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-012
⌄
Published details
- Tag
- PULSE-012
- Description
- 示例产线 PULSE 点 012,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 11
- Address
- Q1.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-013
⌄
Published details
- Tag
- DI-013
- Description
- 示例产线 DI 点 013,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 12
- Address
- I1.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-014
⌄
Published details
- Tag
- DO-014
- Description
- 示例产线 DO 点 014,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 13
- Address
- Q1.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-015
⌄
Published details
- Tag
- AI-015
- Description
- 示例产线 AI 点 015,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 14
- Address
- IW92
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-016
⌄
Published details
- Tag
- AO-016
- Description
- 示例产线 AO 点 016,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 1
- Channel
- 15
- Address
- QW94
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-017
⌄
Published details
- Tag
- RTD-017
- Description
- 示例产线 RTD 点 017,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 0
- Address
- IW96
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-018
⌄
Published details
- Tag
- PULSE-018
- Description
- 示例产线 PULSE 点 018,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 1
- Address
- Q2.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-019
⌄
Published details
- Tag
- DI-019
- Description
- 示例产线 DI 点 019,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 2
- Address
- I2.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-020
⌄
Published details
- Tag
- DO-020
- Description
- 示例产线 DO 点 020,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 3
- Address
- Q2.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-021
⌄
Published details
- Tag
- AI-021
- Description
- 示例产线 AI 点 021,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 4
- Address
- IW104
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-022
⌄
Published details
- Tag
- AO-022
- Description
- 示例产线 AO 点 022,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 5
- Address
- QW106
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-023
⌄
Published details
- Tag
- RTD-023
- Description
- 示例产线 RTD 点 023,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 6
- Address
- IW108
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-024
⌄
Published details
- Tag
- PULSE-024
- Description
- 示例产线 PULSE 点 024,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 7
- Address
- Q2.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-025
⌄
Published details
- Tag
- DI-025
- Description
- 示例产线 DI 点 025,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 8
- Address
- I3.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-026
⌄
Published details
- Tag
- DO-026
- Description
- 示例产线 DO 点 026,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 9
- Address
- Q3.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-027
⌄
Published details
- Tag
- AI-027
- Description
- 示例产线 AI 点 027,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 10
- Address
- IW116
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-028
⌄
Published details
- Tag
- AO-028
- Description
- 示例产线 AO 点 028,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 11
- Address
- QW118
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-029
⌄
Published details
- Tag
- RTD-029
- Description
- 示例产线 RTD 点 029,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 12
- Address
- IW120
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-030
⌄
Published details
- Tag
- PULSE-030
- Description
- 示例产线 PULSE 点 030,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 13
- Address
- Q3.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-031
⌄
Published details
- Tag
- DI-031
- Description
- 示例产线 DI 点 031,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 14
- Address
- I3.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-032
⌄
Published details
- Tag
- DO-032
- Description
- 示例产线 DO 点 032,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 2
- Channel
- 15
- Address
- Q3.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-033
⌄
Published details
- Tag
- AI-033
- Description
- 示例产线 AI 点 033,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 0
- Address
- IW128
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-034
⌄
Published details
- Tag
- AO-034
- Description
- 示例产线 AO 点 034,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 1
- Address
- QW130
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-035
⌄
Published details
- Tag
- RTD-035
- Description
- 示例产线 RTD 点 035,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 2
- Address
- IW132
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-036
⌄
Published details
- Tag
- PULSE-036
- Description
- 示例产线 PULSE 点 036,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 3
- Address
- Q4.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-037
⌄
Published details
- Tag
- DI-037
- Description
- 示例产线 DI 点 037,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 4
- Address
- I4.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-038
⌄
Published details
- Tag
- DO-038
- Description
- 示例产线 DO 点 038,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 5
- Address
- Q4.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-039
⌄
Published details
- Tag
- AI-039
- Description
- 示例产线 AI 点 039,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 6
- Address
- IW140
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-040
⌄
Published details
- Tag
- AO-040
- Description
- 示例产线 AO 点 040,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 7
- Address
- QW142
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-041
⌄
Published details
- Tag
- RTD-041
- Description
- 示例产线 RTD 点 041,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 8
- Address
- IW144
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-042
⌄
Published details
- Tag
- PULSE-042
- Description
- 示例产线 PULSE 点 042,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 9
- Address
- Q5.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-043
⌄
Published details
- Tag
- DI-043
- Description
- 示例产线 DI 点 043,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 10
- Address
- I5.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-044
⌄
Published details
- Tag
- DO-044
- Description
- 示例产线 DO 点 044,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 11
- Address
- Q5.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-045
⌄
Published details
- Tag
- AI-045
- Description
- 示例产线 AI 点 045,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 12
- Address
- IW152
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-046
⌄
Published details
- Tag
- AO-046
- Description
- 示例产线 AO 点 046,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 13
- Address
- QW154
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-047
⌄
Published details
- Tag
- RTD-047
- Description
- 示例产线 RTD 点 047,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 14
- Address
- IW156
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-048
⌄
Published details
- Tag
- PULSE-048
- Description
- 示例产线 PULSE 点 048,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 3
- Channel
- 15
- Address
- Q5.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-049
⌄
Published details
- Tag
- DI-049
- Description
- 示例产线 DI 点 049,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 0
- Address
- I6.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-050
⌄
Published details
- Tag
- DO-050
- Description
- 示例产线 DO 点 050,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 1
- Address
- Q6.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-051
⌄
Published details
- Tag
- AI-051
- Description
- 示例产线 AI 点 051,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 2
- Address
- IW164
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-052
⌄
Published details
- Tag
- AO-052
- Description
- 示例产线 AO 点 052,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 3
- Address
- QW166
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-053
⌄
Published details
- Tag
- RTD-053
- Description
- 示例产线 RTD 点 053,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 4
- Address
- IW168
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-054
⌄
Published details
- Tag
- PULSE-054
- Description
- 示例产线 PULSE 点 054,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 5
- Address
- Q6.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-055
⌄
Published details
- Tag
- DI-055
- Description
- 示例产线 DI 点 055,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 6
- Address
- I6.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-056
⌄
Published details
- Tag
- DO-056
- Description
- 示例产线 DO 点 056,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 7
- Address
- Q6.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-057
⌄
Published details
- Tag
- AI-057
- Description
- 示例产线 AI 点 057,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 8
- Address
- IW176
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-058
⌄
Published details
- Tag
- AO-058
- Description
- 示例产线 AO 点 058,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 9
- Address
- QW178
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-059
⌄
Published details
- Tag
- RTD-059
- Description
- 示例产线 RTD 点 059,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 10
- Address
- IW180
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-060
⌄
Published details
- Tag
- PULSE-060
- Description
- 示例产线 PULSE 点 060,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 11
- Address
- Q7.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-061
⌄
Published details
- Tag
- DI-061
- Description
- 示例产线 DI 点 061,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 12
- Address
- I7.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-062
⌄
Published details
- Tag
- DO-062
- Description
- 示例产线 DO 点 062,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 13
- Address
- Q7.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-063
⌄
Published details
- Tag
- AI-063
- Description
- 示例产线 AI 点 063,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 14
- Address
- IW188
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-064
⌄
Published details
- Tag
- AO-064
- Description
- 示例产线 AO 点 064,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 4
- Channel
- 15
- Address
- QW190
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-065
⌄
Published details
- Tag
- RTD-065
- Description
- 示例产线 RTD 点 065,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 0
- Address
- IW192
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-066
⌄
Published details
- Tag
- PULSE-066
- Description
- 示例产线 PULSE 点 066,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 1
- Address
- Q8.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-067
⌄
Published details
- Tag
- DI-067
- Description
- 示例产线 DI 点 067,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 2
- Address
- I8.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-068
⌄
Published details
- Tag
- DO-068
- Description
- 示例产线 DO 点 068,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 3
- Address
- Q8.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-069
⌄
Published details
- Tag
- AI-069
- Description
- 示例产线 AI 点 069,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 4
- Address
- IW200
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-070
⌄
Published details
- Tag
- AO-070
- Description
- 示例产线 AO 点 070,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 5
- Address
- QW202
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-071
⌄
Published details
- Tag
- RTD-071
- Description
- 示例产线 RTD 点 071,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 6
- Address
- IW204
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-072
⌄
Published details
- Tag
- PULSE-072
- Description
- 示例产线 PULSE 点 072,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 7
- Address
- Q8.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-073
⌄
Published details
- Tag
- DI-073
- Description
- 示例产线 DI 点 073,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 8
- Address
- I9.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-074
⌄
Published details
- Tag
- DO-074
- Description
- 示例产线 DO 点 074,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 9
- Address
- Q9.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-075
⌄
Published details
- Tag
- AI-075
- Description
- 示例产线 AI 点 075,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 10
- Address
- IW212
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-076
⌄
Published details
- Tag
- AO-076
- Description
- 示例产线 AO 点 076,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 11
- Address
- QW214
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-077
⌄
Published details
- Tag
- RTD-077
- Description
- 示例产线 RTD 点 077,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 12
- Address
- IW216
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-078
⌄
Published details
- Tag
- PULSE-078
- Description
- 示例产线 PULSE 点 078,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 13
- Address
- Q9.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-079
⌄
Published details
- Tag
- DI-079
- Description
- 示例产线 DI 点 079,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 14
- Address
- I9.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-080
⌄
Published details
- Tag
- DO-080
- Description
- 示例产线 DO 点 080,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-PLC-01
- Slot
- 5
- Channel
- 15
- Address
- Q9.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-081
⌄
Published details
- Tag
- AI-081
- Description
- 示例产线 AI 点 081,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 0
- Address
- IW224
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-082
⌄
Published details
- Tag
- AO-082
- Description
- 示例产线 AO 点 082,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 1
- Address
- QW226
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-083
⌄
Published details
- Tag
- RTD-083
- Description
- 示例产线 RTD 点 083,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 2
- Address
- IW228
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-084
⌄
Published details
- Tag
- PULSE-084
- Description
- 示例产线 PULSE 点 084,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 3
- Address
- Q10.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-085
⌄
Published details
- Tag
- DI-085
- Description
- 示例产线 DI 点 085,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 4
- Address
- I10.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-086
⌄
Published details
- Tag
- DO-086
- Description
- 示例产线 DO 点 086,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 5
- Address
- Q10.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-087
⌄
Published details
- Tag
- AI-087
- Description
- 示例产线 AI 点 087,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 6
- Address
- IW236
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-088
⌄
Published details
- Tag
- AO-088
- Description
- 示例产线 AO 点 088,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 7
- Address
- QW238
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-089
⌄
Published details
- Tag
- RTD-089
- Description
- 示例产线 RTD 点 089,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 8
- Address
- IW240
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-090
⌄
Published details
- Tag
- PULSE-090
- Description
- 示例产线 PULSE 点 090,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 9
- Address
- Q11.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-091
⌄
Published details
- Tag
- DI-091
- Description
- 示例产线 DI 点 091,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 10
- Address
- I11.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-092
⌄
Published details
- Tag
- DO-092
- Description
- 示例产线 DO 点 092,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 11
- Address
- Q11.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-093
⌄
Published details
- Tag
- AI-093
- Description
- 示例产线 AI 点 093,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 12
- Address
- IW248
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-094
⌄
Published details
- Tag
- AO-094
- Description
- 示例产线 AO 点 094,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 13
- Address
- QW250
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-095
⌄
Published details
- Tag
- RTD-095
- Description
- 示例产线 RTD 点 095,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 14
- Address
- IW252
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-096
⌄
Published details
- Tag
- PULSE-096
- Description
- 示例产线 PULSE 点 096,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 6
- Channel
- 15
- Address
- Q11.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- MCC-01
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-097
⌄
Published details
- Tag
- DI-097
- Description
- 示例产线 DI 点 097,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 0
- Address
- I12.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-098
⌄
Published details
- Tag
- DO-098
- Description
- 示例产线 DO 点 098,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 1
- Address
- Q12.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-099
⌄
Published details
- Tag
- AI-099
- Description
- 示例产线 AI 点 099,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 2
- Address
- IW260
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-100
⌄
Published details
- Tag
- AO-100
- Description
- 示例产线 AO 点 100,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 3
- Address
- QW262
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-101
⌄
Published details
- Tag
- RTD-101
- Description
- 示例产线 RTD 点 101,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 4
- Address
- IW264
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-102
⌄
Published details
- Tag
- PULSE-102
- Description
- 示例产线 PULSE 点 102,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 5
- Address
- Q12.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-103
⌄
Published details
- Tag
- DI-103
- Description
- 示例产线 DI 点 103,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 6
- Address
- I12.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-104
⌄
Published details
- Tag
- DO-104
- Description
- 示例产线 DO 点 104,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 7
- Address
- Q12.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-105
⌄
Published details
- Tag
- AI-105
- Description
- 示例产线 AI 点 105,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 8
- Address
- IW272
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-106
⌄
Published details
- Tag
- AO-106
- Description
- 示例产线 AO 点 106,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 9
- Address
- QW274
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-107
⌄
Published details
- Tag
- RTD-107
- Description
- 示例产线 RTD 点 107,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 10
- Address
- IW276
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-108
⌄
Published details
- Tag
- PULSE-108
- Description
- 示例产线 PULSE 点 108,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 11
- Address
- Q13.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-109
⌄
Published details
- Tag
- DI-109
- Description
- 示例产线 DI 点 109,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 12
- Address
- I13.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-110
⌄
Published details
- Tag
- DO-110
- Description
- 示例产线 DO 点 110,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 13
- Address
- Q13.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-111
⌄
Published details
- Tag
- AI-111
- Description
- 示例产线 AI 点 111,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 14
- Address
- IW284
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-112
⌄
Published details
- Tag
- AO-112
- Description
- 示例产线 AO 点 112,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 7
- Channel
- 15
- Address
- QW286
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-113
⌄
Published details
- Tag
- RTD-113
- Description
- 示例产线 RTD 点 113,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 0
- Address
- IW288
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-114
⌄
Published details
- Tag
- PULSE-114
- Description
- 示例产线 PULSE 点 114,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 1
- Address
- Q14.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-115
⌄
Published details
- Tag
- DI-115
- Description
- 示例产线 DI 点 115,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 2
- Address
- I14.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-116
⌄
Published details
- Tag
- DO-116
- Description
- 示例产线 DO 点 116,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 3
- Address
- Q14.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-117
⌄
Published details
- Tag
- AI-117
- Description
- 示例产线 AI 点 117,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 4
- Address
- IW296
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-118
⌄
Published details
- Tag
- AO-118
- Description
- 示例产线 AO 点 118,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 5
- Address
- QW298
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-119
⌄
Published details
- Tag
- RTD-119
- Description
- 示例产线 RTD 点 119,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 6
- Address
- IW300
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-120
⌄
Published details
- Tag
- PULSE-120
- Description
- 示例产线 PULSE 点 120,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 7
- Address
- Q14.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-121
⌄
Published details
- Tag
- DI-121
- Description
- 示例产线 DI 点 121,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 8
- Address
- I15.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-122
⌄
Published details
- Tag
- DO-122
- Description
- 示例产线 DO 点 122,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 9
- Address
- Q15.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-123
⌄
Published details
- Tag
- AI-123
- Description
- 示例产线 AI 点 123,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 10
- Address
- IW308
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-124
⌄
Published details
- Tag
- AO-124
- Description
- 示例产线 AO 点 124,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 11
- Address
- QW310
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-125
⌄
Published details
- Tag
- RTD-125
- Description
- 示例产线 RTD 点 125,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 12
- Address
- IW312
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-126
⌄
Published details
- Tag
- PULSE-126
- Description
- 示例产线 PULSE 点 126,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 13
- Address
- Q15.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-127
⌄
Published details
- Tag
- DI-127
- Description
- 示例产线 DI 点 127,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 14
- Address
- I15.6
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-128
⌄
Published details
- Tag
- DO-128
- Description
- 示例产线 DO 点 128,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 8
- Channel
- 15
- Address
- Q15.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-129
⌄
Published details
- Tag
- AI-129
- Description
- 示例产线 AI 点 129,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 0
- Address
- IW320
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-130
⌄
Published details
- Tag
- AO-130
- Description
- 示例产线 AO 点 130,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 1
- Address
- QW322
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-131
⌄
Published details
- Tag
- RTD-131
- Description
- 示例产线 RTD 点 131,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 2
- Address
- IW324
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-132
⌄
Published details
- Tag
- PULSE-132
- Description
- 示例产线 PULSE 点 132,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 3
- Address
- Q16.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-133
⌄
Published details
- Tag
- DI-133
- Description
- 示例产线 DI 点 133,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 4
- Address
- I16.4
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-134
⌄
Published details
- Tag
- DO-134
- Description
- 示例产线 DO 点 134,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 5
- Address
- Q16.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-135
⌄
Published details
- Tag
- AI-135
- Description
- 示例产线 AI 点 135,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 6
- Address
- IW332
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-136
⌄
Published details
- Tag
- AO-136
- Description
- 示例产线 AO 点 136,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 7
- Address
- QW334
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-137
⌄
Published details
- Tag
- RTD-137
- Description
- 示例产线 RTD 点 137,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 8
- Address
- IW336
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-138
⌄
Published details
- Tag
- PULSE-138
- Description
- 示例产线 PULSE 点 138,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 9
- Address
- Q17.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-139
⌄
Published details
- Tag
- DI-139
- Description
- 示例产线 DI 点 139,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 10
- Address
- I17.2
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-140
⌄
Published details
- Tag
- DO-140
- Description
- 示例产线 DO 点 140,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 11
- Address
- Q17.3
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- No
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-141
⌄
Published details
- Tag
- AI-141
- Description
- 示例产线 AI 点 141,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 12
- Address
- IW344
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-142
⌄
Published details
- Tag
- AO-142
- Description
- 示例产线 AO 点 142,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 13
- Address
- QW346
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-143
⌄
Published details
- Tag
- RTD-143
- Description
- 示例产线 RTD 点 143,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 14
- Address
- IW348
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-144
⌄
Published details
- Tag
- PULSE-144
- Description
- 示例产线 PULSE 点 144,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 9
- Channel
- 15
- Address
- Q17.7
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDI-145
⌄
Published details
- Tag
- DI-145
- Description
- 示例产线 DI 点 145,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Digital input
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 0
- Address
- I18.0
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagDO-146
⌄
Published details
- Tag
- DO-146
- Description
- 示例产线 DO 点 146,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Digital output
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 1
- Address
- Q18.1
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAI-147
⌄
Published details
- Tag
- AI-147
- Description
- 示例产线 AI 点 147,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- Analog input
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 2
- Address
- IW356
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagAO-148
⌄
Published details
- Tag
- AO-148
- Description
- 示例产线 AO 点 148,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- Analog output
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 3
- Address
- QW358
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- %
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagRTD-149
⌄
Published details
- Tag
- RTD-149
- Description
- 示例产线 RTD 点 149,已记录功能、量程和安全状态
- Direction
- Input
- Signal type
- rtd
- Data type
- real
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 4
- Address
- IW360
- Engineering minimum
- 0.000000
- Engineering maximum
- 100.000000
- Unit
- °C
- Raw minimum
- 0.000000
- Raw maximum
- 27648.000000
- Normal state
- 50
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
I/O point
I/O point
ActiveTagPULSE-150
⌄
Published details
- Tag
- PULSE-150
- Description
- 示例产线 PULSE 点 150,已记录功能、量程和安全状态
- Direction
- Output
- Signal type
- pulse
- Data type
- boolean
- Rack
- RACK-RIO-01
- Slot
- 10
- Channel
- 5
- Address
- Q18.5
- Engineering minimum
- 0.000000
- Engineering maximum
- 1.000000
- Unit
- state
- Raw minimum
- 0.000000
- Raw maximum
- 1.000000
- Normal state
- 0
- Failsafe state
- 0
- Spare
- Yes
- Location
- 包装车间一号线
- Panel
- RIO-101
- Status
- Active
- Notes
- 端子、电缆、信号方向、工程量程和故障安全逻辑已与竣工图核对。
Network device
7⌄
Network device
Network device
ActiveDevice nameSW-CTRL-01ModelSCALANCE XC208IP address192.168.10.2
⌄
Published details
- Device name
- SW-CTRL-01
- Device type
- managed_switch
- Vendor
- Siemens
- Model
- SCALANCE XC208
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- supervisor
- PROFINET name
- sw-ctrl-01
- IP address
- 192.168.10.2
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- Uplink-01
- MAC address
- AA:10:00:00:00:01
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice namePLC-101ModelS7-1515-2 PNIP address192.168.10.10
⌄
Published details
- Device name
- PLC-101
- Device type
- controller
- Vendor
- Siemens
- Model
- S7-1515-2 PN
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- controller
- PROFINET name
- plc-101
- IP address
- 192.168.10.10
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 1
- MAC address
- AA:10:00:00:00:02
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice nameHMI-101ModelTP1200 ComfortIP address192.168.10.20
⌄
Published details
- Device name
- HMI-101
- Device type
- hmi
- Vendor
- Siemens
- Model
- TP1200 Comfort
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- device
- PROFINET name
- hmi-101
- IP address
- 192.168.10.20
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 2
- MAC address
- AA:10:00:00:00:03
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice nameRIO-101ModelET 200SPIP address192.168.10.30
⌄
Published details
- Device name
- RIO-101
- Device type
- remote_io
- Vendor
- Siemens
- Model
- ET 200SP
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- device
- PROFINET name
- rio-101
- IP address
- 192.168.10.30
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 3
- MAC address
- AA:10:00:00:00:04
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice nameVFD-201ModelSINAMICS G120IP address192.168.10.41
⌄
Published details
- Device name
- VFD-201
- Device type
- drive
- Vendor
- Siemens
- Model
- SINAMICS G120
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- device
- PROFINET name
- vfd-201
- IP address
- 192.168.10.41
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 4
- MAC address
- AA:10:00:00:00:05
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice nameVFD-202ModelSINAMICS G120IP address192.168.10.42
⌄
Published details
- Device name
- VFD-202
- Device type
- drive
- Vendor
- Siemens
- Model
- SINAMICS G120
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- device
- PROFINET name
- vfd-202
- IP address
- 192.168.10.42
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 5
- MAC address
- AA:10:00:00:00:06
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
Network device
Network device
ActiveDevice nameVISION-101ModelIn-Sight 7905IP address192.168.10.50
⌄
Published details
- Device name
- VISION-101
- Device type
- vision_system
- Vendor
- Cognex
- Model
- In-Sight 7905
- Network medium
- industrial_ethernet
- Protocol
- profinet
- Protocol role
- device
- PROFINET name
- vision-101
- IP address
- 192.168.10.50
- Subnet prefix
- 24
- Subnet mask
- 255.255.255.0
- Gateway
- 192.168.10.1
- VLAN
- 10
- Switch port
- 6
- MAC address
- AA:10:00:00:00:07
- Location
- 包装车间控制网络
- Status
- Active
- Notes
- 地址、PROFINET 名称、VLAN、交换机端口和 MAC 已与网络图及配置备份核对。
04Execution and commissioning24 Published records29%Overall completion⌄
7Completed
1In progress
1Needs attention
15Not started
I/O checkout
I/O checkout
CompletedCompleted150Total150
100%⌄
Published details
- Scope filters
- Controller ulid: 01m3pcw377qa1q5pz4h2bfwtb2
- Status
- Completed
- Total
- 150
- Completed
- 150
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
Checklist
Checklist
CompletedStarted atSep 29, 2026, 10:55 AM
100%⌄
Published details
- Template version
- 1
- Status
- Completed
- Completion
- 100.00
- Started at
- Sep 29, 2026, 10:55 AM
- Completed at
- Sep 30, 2026, 10:42 AM
0%⌄
Published details
- Number
- P-0001
- Description
- 依据竣工图核对并补全电缆两端标签。
- Category
- installation
- Severity
- Medium
- Priority
- High
- Status
- open
- Due date
- Jul 10, 2026, 12:00 AM
- Resolution
- 整改措施已确定,执行后需提交最终测试和证据。
Punch item
Punch item
In progress0%⌄
Published details
- Number
- P-0002
- Description
- 使现场箭头与 P&ID 和安装方向一致。
- Category
- mechanical
- Severity
- Low
- Priority
- Medium
- Status
- In progress
- Due date
- Jul 11, 2026, 12:00 AM
- Resolution
- 整改措施已确定,执行后需提交最终测试和证据。
Punch item
Punch item
ready_for_review0%⌄
Published details
- Number
- P-0003
- Description
- 产品测试后记录斜坡和电流限制参数。
- Category
- commissioning
- Severity
- Medium
- Priority
- High
- Status
- ready_for_review
- Due date
- Jul 12, 2026, 12:00 AM
- Resolution
- 整改措施已确定,执行后需提交最终测试和证据。
Punch item
Punch item
Blocked0%⌄
Published details
- Number
- P-0004
- Description
- 现有密封头不满足冲洗防护要求;更换并拍照。
- Category
- electrical
- Severity
- High
- Priority
- Urgent
- Status
- Blocked
- Due date
- Jul 13, 2026, 12:00 AM
- Resolution
- 整改措施已确定,执行后需提交最终测试和证据。
Punch item
Punch item
closed0%⌄
Published details
- Number
- P-0005
- Description
- 从操作画面删除停用报警并记录测试结果。
- Category
- software
- Severity
- Low
- Priority
- Low
- Status
- closed
- Due date
- Jul 14, 2026, 12:00 AM
- Resolution
- 整改完成,复测通过,图像已核对,项目已关闭。
- Closed at
- Sep 30, 2026, 10:42 AM
▤
Related record完整检查 150 个生产线 I/O 点 · DI-001
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record完整检查 150 个生产线 I/O 点 · DO-002
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record完整检查 150 个生产线 I/O 点 · AI-003
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record已完成报告 · 预调试准备
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record已完成报告 · 工厂验收测试
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record已完成报告 · 现场验收测试
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related record已完成报告 · 网络调试
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordP-0001 · 完成控制柜网线标签 · 控制网络管理型交换机
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordP-0002 · 修正 XV-101 阀门流向箭头 · 进料紧急切断阀
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordP-0003 · 记录出料变频器最终参数 · 出料输送机变频器
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordP-0004 · 更换压力模拟量电缆密封头 · 管线压力变送器
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordP-0005 · 删除过时 HMI 报警 · 主操作面板
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
06Revision control10 Published records⌄
▤
Revision control
Project files
Technical files, documents, and approved project resources available in this publication.
10
10 published files
Published size: 0.01 MB
PLC projects2
▤
Related recordAX-SMP-IO-001 · 已批准 I/O 清单
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.01 MB
▤
Related recordAX-SMP-PLC-001 · PLC 程序恢复指南
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
HMI and SCADA1
▤
Related recordAX-SMP-HMI-001 · HMI 配置定义
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
Other files7
▤
Related recordAX-SMP-NET-001 · 工业网络图与设置
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.01 MB
▤
Related recordAX-SMP-EL-001 · 主控制柜单线图
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordAX-SMP-FAT-001 · FAT 测试报告
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordAX-SMP-SAT-001 · SAT 测试报告
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordAX-SMP-BOM-001 · 项目最终物料清单
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordAX-SMP-COM-001 · 调试事件报告
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
▤
Related recordAX-SMP-MTG-001 · 项目移交会议日历
◷
Uploaded atSep 29, 2026, 10:55 AM
□
File size0.00 MB
07Change lifecycle46 Published records⌄
Modification request
Modification request
CompletedRequest numberMOC-SAMPLE-001Risk levelHigh
⌄
Published details
- Request number
- MOC-SAMPLE-001
- Scope
- 包装线 2 主柜安全继电器、已映射 I/O、受控图纸和验收证据。
- Reason
- 已安装继电器已停产且不再受制造商支持。
- Risk level
- High
- Risk controls and details
- 必须执行上锁挂牌、点对点验证、见证停止时间测试和书面回退。
- Impact
- Safety: 受控停机期间安全功能不可用。; Production: 计划停产一个班次。; Technical: 安全 I/O 映射和电气图纸修订同步变更。; Schedule: 在批准的维护窗口执行,并在一个工作日内提交报告。; Cost: 包含在批准的示例预算内。
- Proposed change
- 安装获批继电器,验证所有安全输入输出,并将测试图纸标记为竣工版。
- Priority
- High
- Status
- Completed
- Approval decision
- Approved
- Approval notes
- 已作为本地化演示流程的一部分批准。
- Requested at
- Sep 29, 2026, 10:55 AM
- Approved at
- Sep 29, 2026, 10:55 AM
- Implementation notes
- 演示实施证据已可供审核。
- Completed at
- Sep 29, 2026, 10:55 AM
Modification request
Modification request
CompletedRequest numberMOC-SAMPLE-002Risk levelMedium
⌄
Published details
- Request number
- MOC-SAMPLE-002
- Scope
- 控制软件、相关文件、执行测试、备份和操作员培训。
- Reason
- 缩小广播域并隔离工程流量。
- Risk level
- Medium
- Risk controls and details
- 必须完成安全评估、回退副本、上锁挂牌、点对点测试和客户批准。
- Impact
- Safety: 预防性安全措施已评估并记录。; Production: 计划中断网络 30 分钟。; Technical: 逻辑、设置、文件、安装版本和回退计划同步更新。; Schedule: 在批准的维护窗口执行,并在一个工作日内提交报告。; Cost: 包含在批准的示例预算内。
- Proposed change
- 在受控工程环境中实施、复核、仿真和备份,再到现场测试并记录。
- Priority
- Medium
- Status
- Completed
- Approval decision
- Approved
- Approval notes
- 范围、风险、测试计划和回退路径已审核批准。
- Requested at
- Sep 29, 2026, 10:55 AM
- Approved at
- Sep 29, 2026, 10:55 AM
- Implementation notes
- 变更已实施,测试已记录,安装版本已确认,竣工文件已更新。
- Completed at
- Sep 29, 2026, 10:55 AM
Modification request
Modification request
CompletedRequest numberMOC-SAMPLE-003Risk levelLow
⌄
Published details
- Request number
- MOC-SAMPLE-003
- Scope
- 控制软件、相关文件、执行测试、备份和操作员培训。
- Reason
- 稳定显示并避免误报警。
- Risk level
- Low
- Risk controls and details
- 必须完成安全评估、回退副本、上锁挂牌、点对点测试和客户批准。
- Impact
- Safety: 预防性安全措施已评估并记录。; Production: 不停产,进行受控在线测试。; Technical: 逻辑、设置、文件、安装版本和回退计划同步更新。; Schedule: 在批准的维护窗口执行,并在一个工作日内提交报告。; Cost: 包含在批准的示例预算内。
- Proposed change
- 在受控工程环境中实施、复核、仿真和备份,再到现场测试并记录。
- Priority
- Medium
- Status
- Completed
- Approval decision
- Approved
- Approval notes
- 范围、风险、测试计划和回退路径已审核批准。
- Requested at
- Sep 29, 2026, 10:55 AM
- Approved at
- Sep 29, 2026, 10:55 AM
- Implementation notes
- 变更已实施,测试已记录,安装版本已确认,竣工文件已更新。
- Completed at
- Sep 29, 2026, 10:55 AM
Modification request
Modification request
CompletedRequest numberMOC-SAMPLE-004Risk levelMedium
⌄
Published details
- Request number
- MOC-SAMPLE-004
- Scope
- 控制软件、相关文件、执行测试、备份和操作员培训。
- Reason
- 防止产线启动时产品堆积。
- Risk level
- Medium
- Risk controls and details
- 必须完成安全评估、回退副本、上锁挂牌、点对点测试和客户批准。
- Impact
- Safety: 预防性安全措施已评估并记录。; Production: 先空载测试,再带料测试。; Technical: 逻辑、设置、文件、安装版本和回退计划同步更新。; Schedule: 在批准的维护窗口执行,并在一个工作日内提交报告。; Cost: 包含在批准的示例预算内。
- Proposed change
- 在受控工程环境中实施、复核、仿真和备份,再到现场测试并记录。
- Priority
- High
- Status
- Completed
- Approval decision
- Approved
- Approval notes
- 范围、风险、测试计划和回退路径已审核批准。
- Requested at
- Sep 29, 2026, 10:55 AM
- Approved at
- Sep 29, 2026, 10:55 AM
- Implementation notes
- 变更已实施,测试已记录,安装版本已确认,竣工文件已更新。
- Completed at
- Sep 29, 2026, 10:55 AM
Modification request
Modification request
CompletedRequest numberMOC-SAMPLE-005Risk levelLow
⌄
Published details
- Request number
- MOC-SAMPLE-005
- Scope
- 控制软件、相关文件、执行测试、备份和操作员培训。
- Reason
- 让维护人员更快查看设备状态。
- Risk level
- Low
- Risk controls and details
- 必须完成安全评估、回退副本、上锁挂牌、点对点测试和客户批准。
- Impact
- Safety: 预防性安全措施已评估并记录。; Production: 不影响 PLC 逻辑或安全。; Technical: 逻辑、设置、文件、安装版本和回退计划同步更新。; Schedule: 在批准的维护窗口执行,并在一个工作日内提交报告。; Cost: 包含在批准的示例预算内。
- Proposed change
- 在受控工程环境中实施、复核、仿真和备份,再到现场测试并记录。
- Priority
- Low
- Status
- Completed
- Approval decision
- Approved
- Approval notes
- 范围、风险、测试计划和回退路径已审核批准。
- Requested at
- Sep 29, 2026, 10:55 AM
- Approved at
- Sep 29, 2026, 10:55 AM
- Implementation notes
- 变更已实施,测试已记录,安装版本已确认,竣工文件已更新。
- Completed at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from draft to submitted.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from submitted to under_review.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from under_review to approved.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from approved to implementing.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-001 moved from implementing to completed.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from draft to submitted.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from submitted to under_review.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from under_review to approved.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from approved to implementing.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-002 moved from implementing to completed.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from draft to submitted.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from submitted to under_review.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from under_review to approved.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from approved to implementing.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-003 moved from implementing to completed.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from draft to submitted.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from submitted to under_review.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from under_review to approved.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from approved to implementing.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-004 moved from implementing to completed.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from draft to submitted.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from submitted to under_review.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from under_review to approved.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from approved to implementing.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Modification request MOC-SAMPLE-005 moved from implementing to completed.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
与变更关联的受控版本 was linked to modification request MOC-SAMPLE-001.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
变更后测试与验收报告 was linked to modification request MOC-SAMPLE-001.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
与变更关联的受控版本 was linked to modification request MOC-SAMPLE-002.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
变更后测试与验收报告 was linked to modification request MOC-SAMPLE-002.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
与变更关联的受控版本 was linked to modification request MOC-SAMPLE-003.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
变更后测试与验收报告 was linked to modification request MOC-SAMPLE-003.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
与变更关联的受控版本 was linked to modification request MOC-SAMPLE-004.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
变更后测试与验收报告 was linked to modification request MOC-SAMPLE-004.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
与变更关联的受控版本 was linked to modification request MOC-SAMPLE-005.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
变更后测试与验收报告 was linked to modification request MOC-SAMPLE-005.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM
Lifecycle event
Machine passport SAMPLE-LINE-01 was created.
Occurred atSep 29, 2026, 10:55 AM
⌄
Published details
- Occurred at
- Sep 29, 2026, 10:55 AM